Permit: TR-UTL-1025-01787
Permit Details
Apply Date:
10/13/2025
Applicant:
Robert Reynolds - National Barricade
Description:
STEEL MAIN REPLACEMENT - APPROX 1500' OF BORING AND TRENCHING IN DIRT AND ASPHALT 01/15/2026 - Request for 90 Day Renewal as of 01/20/2026
Permit Reviews
Permit Number - TR-UTL-1025-01787
Permit Status: Issued
Permit Description: STEEL MAIN REPLACEMENT - APPROX 1500' OF BORING AND TRENCHING IN DIRT AND ASPHALT
01/15/2026 - Request for 90 Day Renewal as of 01/20/2026
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/13/2025 | RIGHT-OF-WAY REVIEW v.1 | 10/17/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1025-01787
Permit Status: Issued
Permit Description: STEEL MAIN REPLACEMENT - APPROX 1500' OF BORING AND TRENCHING IN DIRT AND ASPHALT
01/15/2026 - Request for 90 Day Renewal as of 01/20/2026
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 10/14/2025 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvement and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 10/14/2025 | A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be effect from NOV 25TH to January 3rd. Due to increase traffic volume on many of the city roads, its necessary to restrict lane closures on certain roads during the Gem Show. |
| 10/14/2025 | UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 10/14/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 10/17/2025 | Pre-Activity Meeting w/Inspections Pre- activity meeting to be held 72 hrs in advance of work start with inspections.. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
Outstanding Inspections
Permit Status: Issued
Permit Number: TR-UTL-1025-01787
Permite Description: STEEL MAIN REPLACEMENT - APPROX 1500' OF BORING AND TRENCHING IN DIRT AND ASPHALT
01/15/2026 - Request for 90 Day Renewal as of 01/20/2026
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/06/2026 | TRSP - ROW - Final | N/A | Re-inspection required |
Completed Inspections
Permit Status: Issued
Permit Number: TR-UTL-1025-01787
Permit Description: STEEL MAIN REPLACEMENT - APPROX 1500' OF BORING AND TRENCHING IN DIRT AND ASPHALT
01/15/2026 - Request for 90 Day Renewal as of 01/20/2026
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/21/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 01/21/2026 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 04/16/2026 | TRSP - ROW - Final | Passed |