Permit: TR-UTL-1025-01765
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
2609 E MENOR SV
Address NEW:
2609 E MENOR SV
Apply Date:
10/08/2025
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 20'X2 TRENCH IN ASPHALT ROW IN ORDER TO REPLACE GAS SERVICE AND REMOVE 1 CONCRETE PANEL
Permit Reviews
Permit Number - TR-UTL-1025-01765
Permit Status: Inspections
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 20'X2 TRENCH IN ASPHALT ROW IN ORDER TO REPLACE GAS SERVICE AND REMOVE 1 CONCRETE PANEL
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/08/2025 | RIGHT-OF-WAY REVIEW v.1 | 10/09/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1025-01765
Permit Status: Inspections
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 20'X2 TRENCH IN ASPHALT ROW IN ORDER TO REPLACE GAS SERVICE AND REMOVE 1 CONCRETE PANEL
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 10/09/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 10/09/2025 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-UTL-1025-01765
Permite Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 20'X2 TRENCH IN ASPHALT ROW IN ORDER TO REPLACE GAS SERVICE AND REMOVE 1 CONCRETE PANEL
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/08/2026 | TRSP - ROW - Final | N/A | Re-inspection required |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-1025-01765
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 20'X2 TRENCH IN ASPHALT ROW IN ORDER TO REPLACE GAS SERVICE AND REMOVE 1 CONCRETE PANEL
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/14/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 10/21/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 10/21/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed |