Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
1709 S CRAYCROFT RD
Apply Date:
10/07/2025
Applicant:
Tucson Electric Power
Description:
WO T146906. Installing a riser on the pole & pulling 75’ of Primary cable to new transformer. 11/5/25- RENEWAL FOR 90 DAYS AS OF 11/14/25 NEW EXPIRATION OF 2/14/26

Permit Reviews

Permit Number - TR-UTL-1025-01759
Permit Status: Complete
Permit Description: WO T146906. Installing a riser on the pole & pulling 75’ of Primary cable to new transformer. 11/5/25- RENEWAL FOR 90 DAYS AS OF 11/14/25 NEW EXPIRATION OF 2/14/26
Start Date Submittal Complete Date Status  
10/08/2025 RIGHT-OF-WAY REVIEW v.1 10/10/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1025-01759
Permit Status: Complete
Permit Description: WO T146906. Installing a riser on the pole & pulling 75’ of Primary cable to new transformer. 11/5/25- RENEWAL FOR 90 DAYS AS OF 11/14/25 NEW EXPIRATION OF 2/14/26
Total Outstanding Activity Conditions - 5
Date Name
10/08/2025 Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvement and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced.
10/08/2025 Traffic control set-up approved between 7:00am - 5:00pm
10/08/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
10/09/2025 Your project work requires that you contact City of Tucson Environmental Services Department (520-791-3171) at least 24 hours prior to closing any street or alley.
10/09/2025

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-1025-01759
Permit Description: WO T146906. Installing a riser on the pole & pulling 75’ of Primary cable to new transformer. 11/5/25- RENEWAL FOR 90 DAYS AS OF 11/14/25 NEW EXPIRATION OF 2/14/26
Total Completed Inspections - 3
Date Description Inspector Results Comments
11/10/2025 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed Site is ready to begin work immediately. Tucson Electric Power has submitted an extension to the permit.
02/10/2026 TRSP - ROW - Backfill - Placement/Compaction Passed Work is complete
02/10/2026 TRSP - ROW - Final Passed Work is complete

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
AERIAL MAP T146906_V1.PDF DOCUMENTS VIEW