Permit: TR-UTL-1025-01757
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
855 W PRINCE RD
Address NEW:
855 W PRINCE RD
Apply Date:
10/07/2025
Applicant:
Cox Communications
Description:
COX TO OVERLASH 754' OF AERIAL FIBER AND BORE 83' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE
Permit Reviews
Permit Number - TR-UTL-1025-01757
Permit Status: Inspections
Permit Description: COX TO OVERLASH 754' OF AERIAL FIBER AND BORE 83' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/08/2025 | RIGHT-OF-WAY REVIEW v.1 | 10/10/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1025-01757
Permit Status: Inspections
Permit Description: COX TO OVERLASH 754' OF AERIAL FIBER AND BORE 83' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 10/08/2025 | BUS STOP IN AREA, CONTACT SUN TRAN DISPTCH AT 520.206.8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 10/08/2025 | A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be effect from NOV 25TH to January 3rd. Due to increase traffic volume on many of the city roads, its necessary to restrict lane closures on certain roads during the Gem Show. |
| 10/08/2025 | Traffic control set-up approved between 9AM - 3:30PM |
| 10/08/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 10/09/2025 | Bike Lane Access and Accommodation |
| 10/09/2025 | Pedestrian Access & Sidewalk |
| 10/09/2025 | Pre-Activity Meeting w/Inspections |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-UTL-1025-01757
Permite Description: COX TO OVERLASH 754' OF AERIAL FIBER AND BORE 83' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | N/A | Scheduled |
Scheduled Inspections
Scheduled Inspections - TR-UTL-1025-01757
Status: Inspections
Description: COX TO OVERLASH 754' OF AERIAL FIBER AND BORE 83' TO INSTALL NEW CATV CONDUIT FOR SYSTEM TIE
| Scheduled Date | Description | Entered By | Entered Date |
|---|---|---|---|
| 12/09/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Scheduled |