Permit: TR-UTL-1025-01733
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1151 N BELVEDERE AV
Address NEW:
1151 N BELVEDERE AV
Apply Date:
10/03/2025
Applicant:
ELIU MELGOZA
Description:
P.345596.E.01- Transfer CenturyLink services from old utility pole to new foreign pole already in place.
Permit Reviews
Permit Number - TR-UTL-1025-01733
Permit Status: Complete
Permit Description: P.345596.E.01- Transfer CenturyLink services from old utility pole to new foreign pole already in place.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/03/2025 | RIGHT-OF-WAY REVIEW v.1 | 10/06/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1025-01733
Permit Status: Complete
Permit Description: P.345596.E.01- Transfer CenturyLink services from old utility pole to new foreign pole already in place.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 10/06/2025 | |
| 10/06/2025 | |
| 10/06/2025 | UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES. |
| 10/06/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 10/06/2025 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1025-01733
Permit Description: P.345596.E.01- Transfer CenturyLink services from old utility pole to new foreign pole already in place.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/18/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 11/18/2025 | TRSP - ROW - AERIAL INSTALLATION | Passed | ||
| 11/19/2025 | TRSP - ROW - Final | Passed |