Permit: TR-UTL-1025-01723
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
7034 E PASEO SAN ANDRES
Address NEW:
7034 E PASEO SAN ANDRES
Apply Date:
10/03/2025
Applicant:
Description:
wo#3120819 7034 e paseo san andres 14-15-07 se leaking service at the north side of the lot in dirt alley 6lf/ar
Permit Reviews
Permit Number - TR-UTL-1025-01723
Permit Status: Complete
Permit Description: wo#3120819 7034 e paseo san andres 14-15-07 se leaking service at the north side of the lot in dirt alley 6lf/ar
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/03/2025 | RIGHT-OF-WAY REVIEW v.1 | 10/03/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1025-01723
Permit Status: Complete
Permit Description: wo#3120819 7034 e paseo san andres 14-15-07 se leaking service at the north side of the lot in dirt alley 6lf/ar
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 10/03/2025 | Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced. |
| 10/03/2025 | EMERGENCY AFTER THE FACT PERMIT – A TCP was not provided due to the nature of the work. Any legal questions related to this work shall be directed to Contractor to address because DTM did not have an opportunity to review, approve, or inspect the work. |
| 10/03/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 10/03/2025 | NOTE: WORK IS BEHIND 7034 E PASEO SAN ANDRES - ADDRESS ON PERMIT IS FOR PERMITTING PURPOSES ONLY. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1025-01723
Permit Description: wo#3120819 7034 e paseo san andres 14-15-07 se leaking service at the north side of the lot in dirt alley 6lf/ar
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/03/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 11/03/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 11/03/2025 | TRSP - ROW - Final | Passed |