Permit: TR-UTL-1025-01715
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2508 E BEVERLY DR
Address NEW:
2508 E BEVERLY DR
Apply Date:
10/03/2025
Applicant:
DOONE BAKER
Description:
P.344231.E.01- Transfer CenturyLink services from old utility pole to new foreign pole already in place.
Permit Reviews
Permit Number - TR-UTL-1025-01715
Permit Status: Complete
Permit Description: P.344231.E.01- Transfer CenturyLink services from old utility pole to new foreign pole already in place.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/03/2025 | RIGHT-OF-WAY REVIEW v.1 | 10/06/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1025-01715
Permit Status: Complete
Permit Description: P.344231.E.01- Transfer CenturyLink services from old utility pole to new foreign pole already in place.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 10/03/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 10/03/2025 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-1025-01715
Permite Description: P.344231.E.01- Transfer CenturyLink services from old utility pole to new foreign pole already in place.
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/08/2025 | TRSP - ROW - Final | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1025-01715
Permit Description: P.344231.E.01- Transfer CenturyLink services from old utility pole to new foreign pole already in place.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/08/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 12/08/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 12/08/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 12/30/2025 | TRSP - ROW - Final | Passed |