Permit: TR-UTL-1025-01712
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
548 E 1ST ST
Address NEW:
548 E 1ST ST
Apply Date:
10/02/2025
Applicant:
Ben Lozano / Border Traffic Safety LLC
Description:
Water main replacement on 1st St from 3rd Ave to 1st Ave
Permit Reviews
Permit Number - TR-UTL-1025-01712
Permit Status: Inspections
Permit Description: Water main replacement on 1st St from 3rd Ave to 1st Ave
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/02/2025 | RIGHT-OF-WAY REVIEW v.1 | 10/10/2025 | REQUIRES RESUBMIT |
| 10/14/2025 | RIGHT-OF-WAY REVIEW v.2 | 10/15/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1025-01712
Permit Status: Inspections
Permit Description: Water main replacement on 1st St from 3rd Ave to 1st Ave
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 10/03/2025 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 10/03/2025 | Traffic Control set-up approved between 7AM - 5PM |
| 10/14/2025 |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TR-UTL-1025-01712
Permite Description: Water main replacement on 1st St from 3rd Ave to 1st Ave
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/30/2025 | TRSP - ROW - Barricade - Setup/Routine | N/A | Re-inspection required | |
| 10/30/2025 | TRSP - ROW - Backfill - Placement/Compaction | N/A | Re-inspection required |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-1025-01712
Permit Description: Water main replacement on 1st St from 3rd Ave to 1st Ave
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/24/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |