Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
5819 S MORRIS BL
Address NEW:
5819 S MORRIS BL
Apply Date:
10/02/2025
Applicant:
ANGEL MORALES
Description:
P.169113C KAHNA BORE 720' & TRENCH 197' TO PLACE CTL CONDUIT AND FIBER CABLE PLACE 4019' OF AERIAL FIBER CABLE PLACE 1 CABINET, 8 HAND HOLES & 6 PEDESTAL

Permit Reviews

Permit Number - TR-UTL-1025-01708
Permit Status: Complete
Permit Description: P.169113C KAHNA BORE 720' & TRENCH 197' TO PLACE CTL CONDUIT AND FIBER CABLE PLACE 4019' OF AERIAL FIBER CABLE PLACE 1 CABINET, 8 HAND HOLES & 6 PEDESTAL
Start Date Submittal Complete Date Status  
10/02/2025 RIGHT-OF-WAY REVIEW v.1 10/06/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1025-01708
Permit Status: Complete
Permit Description: P.169113C KAHNA BORE 720' & TRENCH 197' TO PLACE CTL CONDUIT AND FIBER CABLE PLACE 4019' OF AERIAL FIBER CABLE PLACE 1 CABINET, 8 HAND HOLES & 6 PEDESTAL
Total Outstanding Activity Conditions - 4
Date Name
10/02/2025 BUS STOP IN AREA, CONTACT SUN TRAN DISPTCH AT 520.206.8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
10/02/2025 S Morris Bl and Southland Bl are UNDER A PAVEMENT MORATORIUM, ANY NEW ASPHALT THAT IS DISTURBED WILL REQUIRE A 2” MILL AND OVERLAY FOR 25’ IN EACH DIRECTION FROM THE OUTSIDE OF THE CUT FOR ALL EFFECTED TRAVEL LANES.
10/02/2025 Traffic control set-up approved between 9AM - 3:30PM
10/02/2025 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-1025-01708
Permit Description: P.169113C KAHNA BORE 720' & TRENCH 197' TO PLACE CTL CONDUIT AND FIBER CABLE PLACE 4019' OF AERIAL FIBER CABLE PLACE 1 CABINET, 8 HAND HOLES & 6 PEDESTAL
Total Completed Inspections - 4
Date Description Inspector Results Comments
01/21/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
01/21/2026 TRSP - ROW - Backfill - Placement/Compaction Passed
01/21/2026 TRSP - ROW - AERIAL INSTALLATION Passed
01/21/2026 TRSP - ROW - Final Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
P.169113C AERIAL SITE MAP 10-2-2025_V1.PDF DOCUMENTS VIEW
P.169113C CIVIL PERMIT 10-2-2025_V1.PDF DOCUMENTS VIEW
P.169113C TCP 10-2-2025_V1.PDF DOCUMENTS VIEW