Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-1024-02085
Permit Details
Apply Date:
10/31/2024
Applicant:
Ilana Galluzzo
Description:
(2) 6' x 6' BELL HOLES IN DIRT WITH AN APPROX. 2' x 75' TRENCH IN DIRT TO INSTALL NEW GAS SERVICE
Permit Reviews
Permit Number - TR-UTL-1024-02085
Permit Status: Complete
Permit Description: (2) 6' x 6' BELL HOLES IN DIRT WITH AN APPROX. 2' x 75' TRENCH IN DIRT TO INSTALL NEW GAS SERVICE
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/31/2024 | RIGHT-OF-WAY REVIEW v.1 | 11/01/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1024-02085
Permit Status: Complete
Permit Description: (2) 6' x 6' BELL HOLES IN DIRT WITH AN APPROX. 2' x 75' TRENCH IN DIRT TO INSTALL NEW GAS SERVICE
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
11/01/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
11/01/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1024-02085
Permit Description: (2) 6' x 6' BELL HOLES IN DIRT WITH AN APPROX. 2' x 75' TRENCH IN DIRT TO INSTALL NEW GAS SERVICE
Total Completed Inspections - 4
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/25/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | phone call with NPL, starting once crew is available, calling in barricade setup for next inspection. Confirmed area is not impacting holiday restriction lanes. | |
01/07/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | Early warning signs and tapered barricades all in place per plan, approved | |
01/09/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Backfilled with native soil, compacted to 85%, slurry was used over gas line in area crossing wash underpass | |
01/09/2025 | TRSP - ROW - Final | Passed | All prior inspections completed, traffic control removed, site completed |