Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Apply Date:
10/31/2024
Applicant:
Ilana Galluzzo
Description:
(2) 6' x 6' BELL HOLES IN DIRT WITH AN APPROX. 2' x 75' TRENCH IN DIRT TO INSTALL NEW GAS SERVICE

Permit Reviews

Permit Number - TR-UTL-1024-02085
Permit Status: Complete
Permit Description: (2) 6' x 6' BELL HOLES IN DIRT WITH AN APPROX. 2' x 75' TRENCH IN DIRT TO INSTALL NEW GAS SERVICE
Start Date Submittal Complete Date Status  
10/31/2024 RIGHT-OF-WAY REVIEW v.1 11/01/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1024-02085
Permit Status: Complete
Permit Description: (2) 6' x 6' BELL HOLES IN DIRT WITH AN APPROX. 2' x 75' TRENCH IN DIRT TO INSTALL NEW GAS SERVICE
Total Outstanding Activity Conditions - 2
Date Name
11/01/2024 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
11/01/2024 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-1024-02085
Permit Description: (2) 6' x 6' BELL HOLES IN DIRT WITH AN APPROX. 2' x 75' TRENCH IN DIRT TO INSTALL NEW GAS SERVICE
Total Completed Inspections - 4
Date Description Inspector Results Comments
11/25/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed phone call with NPL, starting once crew is available, calling in barricade setup for next inspection. Confirmed area is not impacting holiday restriction lanes.
01/07/2025 TRSP - ROW - Barricade - Setup/Routine Passed Early warning signs and tapered barricades all in place per plan, approved
01/09/2025 TRSP - ROW - Backfill - Placement/Compaction Passed Backfilled with native soil, compacted to 85%, slurry was used over gas line in area crossing wash underpass
01/09/2025 TRSP - ROW - Final Passed All prior inspections completed, traffic control removed, site completed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
3480 E BRITANNIA DR 4937640_V1.PDF DOCUMENTS VIEW
3480 E BRITANNIA DR TCP_V1.PDF DOCUMENTS VIEW