Permit: TR-UTL-1024-02081
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1850 N DRAGOON ST
Address NEW:
1850 N DRAGOON ST
Apply Date:
10/31/2024
Applicant:
Adrien Pineda
Description:
** PROP 411 ** ARIZONA PIPELINE WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN CONCRTE SIDEWALK ALONG WITH (1) 25X3 TRENCH ACROSS ASPHALT ROAD AND (1) 5X5 BELL HOLE IN ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 1850 N DRAGOON ST
Permit Reviews
Permit Number - TR-UTL-1024-02081
Permit Status: Complete
Permit Description: ** PROP 411 ** ARIZONA PIPELINE WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN CONCRTE SIDEWALK ALONG WITH (1) 25X3 TRENCH ACROSS ASPHALT ROAD AND (1) 5X5 BELL HOLE IN ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 1850 N DRAGOON ST
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/31/2024 | RIGHT-OF-WAY REVIEW v.1 | 11/05/2024 | REQUIRES RESUBMIT |
| 11/15/2024 | RIGHT-OF-WAY REVIEW v.2 | 11/15/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1024-02081
Permit Status: Complete
Permit Description: ** PROP 411 ** ARIZONA PIPELINE WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN CONCRTE SIDEWALK ALONG WITH (1) 25X3 TRENCH ACROSS ASPHALT ROAD AND (1) 5X5 BELL HOLE IN ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 1850 N DRAGOON ST
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 11/01/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 11/01/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1024-02081
Permit Description: ** PROP 411 ** ARIZONA PIPELINE WILL NEED TO EXCAVATE (1) 5X5 BELL HOLE IN CONCRTE SIDEWALK ALONG WITH (1) 25X3 TRENCH ACROSS ASPHALT ROAD AND (1) 5X5 BELL HOLE IN ASPHALT ROAD IN ORDER TO REPLACE GAS SERVICE FOR 1850 N DRAGOON ST
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/17/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 12/17/2024 | TRSP - ROW - Paving - Subgrade/removal/placement | Passed | ||
| 12/17/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 12/17/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 12/17/2024 | TRSP - ROW - Final | Passed |