Permit: TR-UTL-1024-02078
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3411 S CAMINO SECO
Address NEW:
3411 S CAMINO SECO
Apply Date:
10/30/2024
Applicant:
Caitlin Ripley
Description:
PRJ280589-1: Cox to overlash 1549' to existing aerial, trench 4' and bore 232' to install CATV conduit for system tie.
Permit Reviews
Permit Number - TR-UTL-1024-02078
Permit Status: Complete
Permit Description: PRJ280589-1: Cox to overlash 1549' to existing aerial, trench 4' and bore 232' to install CATV conduit for system tie.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/31/2024 | RIGHT-OF-WAY REVIEW v.1 | 11/01/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1024-02078
Permit Status: Complete
Permit Description: PRJ280589-1: Cox to overlash 1549' to existing aerial, trench 4' and bore 232' to install CATV conduit for system tie.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 11/01/2024 | PAVEMENT MORATORIUM |
| 11/01/2024 | PRE-CON/PAVEMENT/SIDEWALK |
| 11/01/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1024-02078
Permit Description: PRJ280589-1: Cox to overlash 1549' to existing aerial, trench 4' and bore 232' to install CATV conduit for system tie.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/26/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | on site review with Rich, starting boring on Monday. | |
| 02/28/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | All work has been completed, all traffic control has been removed, and a final inspection was passed. | |
| 02/18/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | backfill performed in landscape areas with native soil, compacted to 85%, completed and approved | |
| 02/18/2025 | TRSP - ROW - Final | Passed | All prior inspections passed, traffic control removed, job completed |