Permit: TR-UTL-1024-02071
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
1918 N STONE AV
Address NEW:
1918 N STONE AV
Apply Date:
10/29/2024
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 SIDEWALK PANEL IN ORDER TO DO GAS WORK * ON EAST SIDE OF STONE BETWEEN E VENTURA ST AND W PLATA ST**
Permit Reviews
Permit Number - TR-UTL-1024-02071
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 SIDEWALK PANEL IN ORDER TO DO GAS WORK * ON EAST SIDE OF STONE BETWEEN E VENTURA ST AND W PLATA ST**
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/29/2024 | RIGHT-OF-WAY REVIEW v.1 | 10/31/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1024-02071
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 SIDEWALK PANEL IN ORDER TO DO GAS WORK * ON EAST SIDE OF STONE BETWEEN E VENTURA ST AND W PLATA ST**
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 10/30/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 10/30/2024 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
Conditions
Permit Number - TR-UTL-1024-02071
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 SIDEWALK PANEL IN ORDER TO DO GAS WORK * ON EAST SIDE OF STONE BETWEEN E VENTURA ST AND W PLATA ST**
| Date | Description | Comments |
|---|---|---|
| 11/12/2024 | The following extended traffic control set-up times were approved: |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1024-02071
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE 1 SIDEWALK PANEL IN ORDER TO DO GAS WORK * ON EAST SIDE OF STONE BETWEEN E VENTURA ST AND W PLATA ST**
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/06/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 12/09/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 12/09/2024 | TRSP - ROW - Barricade Takedown | Passed | ||
| 12/09/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 12/09/2024 | TRSP - ROW - Final | Passed |