Permit: TR-UTL-1024-02069
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
8265 E WRIGHTSTOWN RD
Address NEW:
8265 E WRIGHTSTOWN RD
Apply Date:
10/29/2024
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE WILL NEED TO EXCAVATE (1) 30X3 TRENCH ALONG WITH (1) 5X5 BELLHOLE IN DIRT RIGHT OF WAY IN ORDER TO REPLACE GAS SERVICE AT 8265 E WRIGHTSTOWN RD
Permit Reviews
Permit Number - TR-UTL-1024-02069
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (1) 30X3 TRENCH ALONG WITH (1) 5X5 BELLHOLE IN DIRT RIGHT OF WAY IN ORDER TO REPLACE GAS SERVICE AT 8265 E WRIGHTSTOWN RD
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/29/2024 | RIGHT-OF-WAY REVIEW v.1 | 10/30/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1024-02069
Permit Status: Complete
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (1) 30X3 TRENCH ALONG WITH (1) 5X5 BELLHOLE IN DIRT RIGHT OF WAY IN ORDER TO REPLACE GAS SERVICE AT 8265 E WRIGHTSTOWN RD
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 10/30/2024 | Traffic Control set-up approved between 7AM - 5PM |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-1024-02069
Permite Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (1) 30X3 TRENCH ALONG WITH (1) 5X5 BELLHOLE IN DIRT RIGHT OF WAY IN ORDER TO REPLACE GAS SERVICE AT 8265 E WRIGHTSTOWN RD
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/04/2024 | TRSP - ROW - Final | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1024-02069
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (1) 30X3 TRENCH ALONG WITH (1) 5X5 BELLHOLE IN DIRT RIGHT OF WAY IN ORDER TO REPLACE GAS SERVICE AT 8265 E WRIGHTSTOWN RD
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/25/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 12/06/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 12/06/2024 | TRSP - ROW - Final | Passed |