Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
6996 E MARY DR
Address NEW:
6996 E MARY DR
Apply Date:
10/29/2024
Applicant:
luis granillo
Description:
wo2889387 6996 e mary dr 15-14-30 ne replacement of a damaged hydrant located at the east side of property 6lf/ar

Permit Reviews

Permit Number - TR-UTL-1024-02062
Permit Status: Complete
Permit Description: wo2889387 6996 e mary dr 15-14-30 ne replacement of a damaged hydrant located at the east side of property 6lf/ar
Start Date Submittal Complete Date Status  
10/29/2024 RIGHT-OF-WAY REVIEW v.1 10/29/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1024-02062
Permit Status: Complete
Permit Description: wo2889387 6996 e mary dr 15-14-30 ne replacement of a damaged hydrant located at the east side of property 6lf/ar
Total Outstanding Activity Conditions - 1
Date Name
10/29/2024 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-1024-02062
Permit Description: wo2889387 6996 e mary dr 15-14-30 ne replacement of a damaged hydrant located at the east side of property 6lf/ar
Total Completed Inspections - 3
Date Description Inspector Results Comments
12/19/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed work completed, no preactivity meeting held
12/19/2024 TRSP - ROW - Backfill - Placement/Compaction Passed
12/19/2024 TRSP - ROW - Final Passed