Permit: TR-UTL-1024-02053
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
8355 E COOPER PL
Address NEW:
8355 E COOPER PL
Apply Date:
10/28/2024
Applicant:
Tucson Electric Power
Description:
AFTER-THE-FACT: WO T129650. TEP INSTALLED GROUNDING AT CIRCLED POLES (10).
Permit Reviews
Permit Number - TR-UTL-1024-02053
Permit Status: Complete
Permit Description: AFTER-THE-FACT: WO T129650. TEP INSTALLED GROUNDING AT CIRCLED POLES (10).
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/28/2024 | RIGHT-OF-WAY REVIEW v.1 | 10/28/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1024-02053
Permit Status: Complete
Permit Description: AFTER-THE-FACT: WO T129650. TEP INSTALLED GROUNDING AT CIRCLED POLES (10).
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 10/28/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 10/28/2024 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1024-02053
Permit Description: AFTER-THE-FACT: WO T129650. TEP INSTALLED GROUNDING AT CIRCLED POLES (10).
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2024 | TRSP - ROW - Final | Passed |