Permit: TR-UTL-1024-02029
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
150 W AVIATION DR
Address NEW:
150 W AVIATION DR
Apply Date:
10/22/2024
Applicant:
Tucson Electric Power
Description:
WO T130752, T128274 - TEP TO REPLACE 4 BAD POLES LOCATED IN THE ALLEY AND ADDING 2 SUPPORTING ANCHORS. EXCAVATION FOR EACH HOLE WILL BE APPROX. 6’ DEEP WITH A 24” DIAMETER.
Permit Reviews
Permit Number - TR-UTL-1024-02029
Permit Status: Complete
Permit Description: WO T130752, T128274 - TEP TO REPLACE 4 BAD POLES LOCATED IN THE ALLEY AND ADDING 2 SUPPORTING ANCHORS. EXCAVATION FOR EACH HOLE WILL BE APPROX. 6’ DEEP WITH A 24” DIAMETER.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/22/2024 | RIGHT-OF-WAY REVIEW v.1 | 10/23/2024 | APPROVED |
| 01/03/2025 | RIGHT-OF-WAY REVIEW REVISION v.1 | 01/06/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1024-02029
Permit Status: Complete
Permit Description: WO T130752, T128274 - TEP TO REPLACE 4 BAD POLES LOCATED IN THE ALLEY AND ADDING 2 SUPPORTING ANCHORS. EXCAVATION FOR EACH HOLE WILL BE APPROX. 6’ DEEP WITH A 24” DIAMETER.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 10/23/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 10/23/2024 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1024-02029
Permit Description: WO T130752, T128274 - TEP TO REPLACE 4 BAD POLES LOCATED IN THE ALLEY AND ADDING 2 SUPPORTING ANCHORS. EXCAVATION FOR EACH HOLE WILL BE APPROX. 6’ DEEP WITH A 24” DIAMETER.
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/10/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 02/10/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 02/10/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 02/10/2025 | TRSP - ROW - Final | Passed |