Permit: TR-UTL-1024-02020
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
6975 S SAN FERNANDO RD
Address NEW:
6975 S SAN FERNANDO RD
Apply Date:
10/21/2024
Applicant:
Caitlin Ripley - Southwest Barricades
Description:
PRJ277647-2 This permit is connected to TR-UTL-0924-01802, same TCP will be used. Cox to trench 26' and bore 153' to install new CATV conduit for a system tie.
Permit Reviews
Permit Number - TR-UTL-1024-02020
Permit Status: Complete
Permit Description: PRJ277647-2 This permit is connected to TR-UTL-0924-01802, same TCP will be used. Cox to trench 26' and bore 153' to install new CATV conduit for a system tie.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/28/2024 | RIGHT-OF-WAY REVIEW v.2 | 10/28/2024 | APPROVED |
| 10/22/2024 | RIGHT-OF-WAY REVIEW v.1 | 10/22/2024 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-1024-02020
Permit Status: Complete
Permit Description: PRJ277647-2 This permit is connected to TR-UTL-0924-01802, same TCP will be used. Cox to trench 26' and bore 153' to install new CATV conduit for a system tie.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 10/22/2024 | Traffic Control set-up approved between 7AM - 5PM |
| 10/22/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 10/22/2024 | Pavement along S San Fernando Rd is under Pavement Moratorium between Valencia Rd and Los Reales Rd. P Pavement is under a No Cut Moratorium status as of April 2024.. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1024-02020
Permit Description: PRJ277647-2 This permit is connected to TR-UTL-0924-01802, same TCP will be used. Cox to trench 26' and bore 153' to install new CATV conduit for a system tie.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/12/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 02/12/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 02/12/2025 | TRSP - ROW - Barricade Takedown | Passed | ||
| 02/12/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 02/12/2025 | TRSP - ROW - Final | Passed |