Permit: TR-UTL-1024-02011
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3656 E BLACKLIDGE DR
Address NEW:
3656 E BLACKLIDGE DR
Apply Date:
10/18/2024
Applicant:
Chelsey Bolinger
Description:
P.066643D (KAHNA) – Previously approved/expired permit TR-UTL-0424-00745 - BORE 411’ & TRENCH 28’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (3) FLOWERPOTS & (2) PEDESTAL. OVERLASH 791’ OF AERIAL FIBER CABLE.
Permit Reviews
Permit Number - TR-UTL-1024-02011
Permit Status: Complete
Permit Description: P.066643D (KAHNA) – Previously approved/expired permit TR-UTL-0424-00745 - BORE 411’ & TRENCH 28’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (3) FLOWERPOTS & (2) PEDESTAL. OVERLASH 791’ OF AERIAL FIBER CABLE.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/18/2024 | RIGHT-OF-WAY REVIEW v.1 | 10/22/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1024-02011
Permit Status: Complete
Permit Description: P.066643D (KAHNA) – Previously approved/expired permit TR-UTL-0424-00745 - BORE 411’ & TRENCH 28’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (3) FLOWERPOTS & (2) PEDESTAL. OVERLASH 791’ OF AERIAL FIBER CABLE.
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 10/21/2024 | PRE-CON/PAVEMENT/SIDEWALK |
| 10/21/2024 | Traffic Control set-up approved between 7AM - 5PM |
| 10/21/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1024-02011
Permit Description: P.066643D (KAHNA) – Previously approved/expired permit TR-UTL-0424-00745 - BORE 411’ & TRENCH 28’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (3) FLOWERPOTS & (2) PEDESTAL. OVERLASH 791’ OF AERIAL FIBER CABLE.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/03/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | Spoke with Robert on Monday, February 3 and he confirmed that work has been completed. No pre-con meeting was held because this permit is a renewal of an old expired permit where a pre-con was already held. | |
| 02/03/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Spoke with Robert on Monday, February 3 and he confirmed that work has been completed. No backfill inspection was held because this permit is a renewal of an old expired permit and work was already completed. | |
| 02/03/2025 | TRSP - ROW - Final | Passed | Spoke with Robert on Monday, February 3 and he confirmed that work has been completed. |