Permit: TR-UTL-1024-02009
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2862 N PALO VERDE BL
Address NEW:
2862 N PALO VERDE BL
Apply Date:
10/18/2024
Applicant:
Chelsey Bolinger
Description:
P.066643A (KAHNA) – Previously approved/expired permit TR-UTL-0424-00742 - BORE 2,900’ & TRENCH 141’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (6) HANDHOLES, (7) FLOWERPOTS & (2) PEDESTALS. OVERLASH 1,586’ OF AERIAL FIBER CABLE.
Permit Reviews
Permit Number - TR-UTL-1024-02009
Permit Status: Complete
Permit Description: P.066643A (KAHNA) – Previously approved/expired permit TR-UTL-0424-00742 - BORE 2,900’ & TRENCH 141’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (6) HANDHOLES, (7) FLOWERPOTS & (2) PEDESTALS. OVERLASH 1,586’ OF AERIAL FIBER CABLE.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/18/2024 | RIGHT-OF-WAY REVIEW v.1 | 10/22/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1024-02009
Permit Status: Complete
Permit Description: P.066643A (KAHNA) – Previously approved/expired permit TR-UTL-0424-00742 - BORE 2,900’ & TRENCH 141’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (6) HANDHOLES, (7) FLOWERPOTS & (2) PEDESTALS. OVERLASH 1,586’ OF AERIAL FIBER CABLE.
Total Outstanding Activity Conditions - 5
| Date | Name |
|---|---|
| 10/21/2024 | BUS STOP/ ROUTE |
| 10/21/2024 | PRE-CON/PAVEMENT/SIDEWALK |
| 10/21/2024 | PROP 411 |
| 10/21/2024 | Traffic Control set-up approved between 7AM - 5PM |
| 10/21/2024 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1024-02009
Permit Description: P.066643A (KAHNA) – Previously approved/expired permit TR-UTL-0424-00742 - BORE 2,900’ & TRENCH 141’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (6) HANDHOLES, (7) FLOWERPOTS & (2) PEDESTALS. OVERLASH 1,586’ OF AERIAL FIBER CABLE.
Total Completed Inspections - 3
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/14/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 01/14/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 05/07/2025 | TRSP - ROW - Final | Passed |