Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TR-UTL-1024-02005
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
3781 E EVENTIDE ST
Address NEW:
3781 E EVENTIDE ST
Apply Date:
10/17/2024
Applicant:
Chelsey Bolinger
Description:
P.122870B (KAHNA) - BORE 4,664' & TRENCH 124’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (4) HANDHOLES & (19) PEDESTALS.
Permit Reviews
Permit Number - TR-UTL-1024-02005
Permit Status: Complete
Permit Description: P.122870B (KAHNA) - BORE 4,664' & TRENCH 124’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (4) HANDHOLES & (19) PEDESTALS.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/18/2024 | RIGHT-OF-WAY REVIEW v.1 | 10/21/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1024-02005
Permit Status: Complete
Permit Description: P.122870B (KAHNA) - BORE 4,664' & TRENCH 124’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (4) HANDHOLES & (19) PEDESTALS.
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 10/21/2024 | Traffic Control set-up approved between 7AM - 5PM |
| 10/21/2024 | Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1024-02005
Permit Description: P.122870B (KAHNA) - BORE 4,664' & TRENCH 124’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (4) HANDHOLES & (19) PEDESTALS.
Total Completed Inspections - 5
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/13/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | covered same area in pre-con for hemisphere loop, Permit A | |
| 04/10/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | Work is complete and permit is expired. | |
| 05/05/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | Work is complete | |
| 05/05/2025 | TRSP - ROW - Barricade Takedown | Passed | Work is complete | |
| 05/05/2025 | TRSP - ROW - Final | Passed | Work is complete and final pavement repair is done |