Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
921 E 36TH ST
Address NEW:
921 E 36TH ST
Apply Date:
10/14/2024
Applicant:
Description:
wo2864214 921 e 36th st 14-14-19 sw new service install in dirt 6lf/ar

Permit Reviews

Permit Number - TR-UTL-1024-01981
Permit Status: Complete
Permit Description: wo2864214 921 e 36th st 14-14-19 sw new service install in dirt 6lf/ar
Start Date Submittal Complete Date Status  
10/15/2024 RIGHT-OF-WAY REVIEW v.1 10/15/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1024-01981
Permit Status: Complete
Permit Description: wo2864214 921 e 36th st 14-14-19 sw new service install in dirt 6lf/ar
Total Outstanding Activity Conditions - 2
Date Name
10/15/2024 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
10/15/2024 Traffic Control set-up approved between 7AM - 5PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-1024-01981
Permit Description: wo2864214 921 e 36th st 14-14-19 sw new service install in dirt 6lf/ar
Total Completed Inspections - 4
Date Description Inspector Results Comments
11/18/2024 TRSP - ROW - Barricade - Setup/Routine Passed
11/18/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
11/18/2024 TRSP - ROW - Backfill - Placement/Compaction Passed
11/18/2024 TRSP - ROW - Final Passed

Documents

File Name Document Type  
921 E 36TH ST_C SKETCH_V1.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW