Permit: TR-UTL-1024-01975
Permit Details
Apply Date:
10/14/2024
Applicant:
DOONE BAKER
Description:
P.067126C (KAHNA) – (Job previously approved under the original design TR-UTL-0523-01541, no construction work done under original design) - BORE 3,612’ & TRENCH 32’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (41) HANDHOLES & PEDESTALS.
Permit Reviews
Permit Number - TR-UTL-1024-01975
Permit Status: Issued
Permit Description: P.067126C (KAHNA) – (Job previously approved under the original design TR-UTL-0523-01541, no construction work done under original design) - BORE 3,612’ & TRENCH 32’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (41) HANDHOLES & PEDESTALS.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/15/2024 | RIGHT-OF-WAY REVIEW v.1 | 10/15/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1024-01975
Permit Status: Issued
Permit Description: P.067126C (KAHNA) – (Job previously approved under the original design TR-UTL-0523-01541, no construction work done under original design) - BORE 3,612’ & TRENCH 32’ TO PLACE CTL CONDUIT & FIBER CABLE. PLACE (1) FSAI CABINET, (41) HANDHOLES & PEDESTALS.
Total Outstanding Activity Conditions - 2
Date | Name |
---|---|
10/15/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
10/15/2024 | Traffic Control set-up approved between 7AM - 5PM |