Permit: TR-UTL-1024-01959
Permit Details
Apply Date:
10/11/2024
Applicant:
Cox Communications
Description:
Cox to pull 650' of fiber through existing conduit for system tie.
Permit Reviews
Permit Number - TR-UTL-1024-01959
Permit Status: Complete
Permit Description: Cox to pull 650' of fiber through existing conduit for system tie.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/11/2024 | RIGHT-OF-WAY REVIEW v.1 | 10/14/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1024-01959
Permit Status: Complete
Permit Description: Cox to pull 650' of fiber through existing conduit for system tie.
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
10/11/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
10/11/2024 | Traffic control set-up approved between 9AM - 3:30PM |
10/11/2024 | A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 02. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season. |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1024-01959
Permit Description: Cox to pull 650' of fiber through existing conduit for system tie.
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/10/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | on site meeting with Kory, expecting one day job to be completed this week, will notify when barricades are set up | |
12/19/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | barricades set up not witnessed, job completed | |
12/31/2024 | TRSP - ROW - Final | Passed | All previous inspections passed, site clean and clear of traffic control, job completed |