Permit: TR-UTL-1024-01952
Permit Details
Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
819 W WEDWICK ST
Address NEW:
819 W WEDWICK ST
Apply Date:
10/10/2024
Applicant:
BRIAN MAJUTA JR - Quail Construction
Description:
EXCAVATING A 45X5 TRENCH AT 819 & 815 W WEDWICK ST TO REPLACE GAS SERVICE IN ROW IN DIRT. TRENCH WILL BE LOCATED APPROX 15 FEET WEST OF EAST P/L ON SOUTH PROPERTY BOUNDRY
Permit Reviews
Permit Number - TR-UTL-1024-01952
Permit Status: Complete
Permit Description: EXCAVATING A 45X5 TRENCH AT 819 & 815 W WEDWICK ST TO REPLACE GAS SERVICE IN ROW IN DIRT. TRENCH WILL BE LOCATED APPROX 15 FEET WEST OF EAST P/L ON SOUTH PROPERTY BOUNDRY
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/15/2024 | RIGHT-OF-WAY REVIEW v.2 | 10/15/2024 | REQUIRES RESUBMIT |
| 10/22/2024 | RIGHT-OF-WAY REVIEW v.3 | 10/22/2024 | REQUIRES RESUBMIT |
| 10/10/2024 | RIGHT-OF-WAY REVIEW v.1 | 10/11/2024 | REQUIRES RESUBMIT |
| 10/25/2024 | RIGHT-OF-WAY REVIEW v.4 | 10/25/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1024-01952
Permit Status: Complete
Permit Description: EXCAVATING A 45X5 TRENCH AT 819 & 815 W WEDWICK ST TO REPLACE GAS SERVICE IN ROW IN DIRT. TRENCH WILL BE LOCATED APPROX 15 FEET WEST OF EAST P/L ON SOUTH PROPERTY BOUNDRY
Total Outstanding Activity Conditions - 2
| Date | Name |
|---|---|
| 10/10/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. |
| 10/10/2024 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1024-01952
Permit Description: EXCAVATING A 45X5 TRENCH AT 819 & 815 W WEDWICK ST TO REPLACE GAS SERVICE IN ROW IN DIRT. TRENCH WILL BE LOCATED APPROX 15 FEET WEST OF EAST P/L ON SOUTH PROPERTY BOUNDRY
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/27/2024 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 11/27/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 11/27/2024 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 11/27/2024 | TRSP - ROW - Final | Passed |