Permit: TR-UTL-1024-01911
Permit Details
Apply Date:
10/07/2024
Applicant:
Desert Barricades LLC
Description:
WO T105204 - Replacing 3-46kV poles and installing 1-4kV pole
Permit Reviews
Permit Number - TR-UTL-1024-01911
Permit Status: Complete
Permit Description: WO T105204 - Replacing 3-46kV poles and installing 1-4kV pole
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/07/2024 | RIGHT-OF-WAY REVIEW v.1 | 10/17/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1024-01911
Permit Status: Complete
Permit Description: WO T105204 - Replacing 3-46kV poles and installing 1-4kV pole
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 10/07/2024 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. . |
| 10/07/2024 | Traffic control set-up approved between 9AM - 3:30PM |
| 10/07/2024 | A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be in effect from Thanksgiving Day to January 02. Due to the increasing traffic volume on many of the City’s roads, it is necessary to restrict lane closures on certain roads during the holiday season. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TR-UTL-1024-01911
Permite Description: WO T105204 - Replacing 3-46kV poles and installing 1-4kV pole
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/10/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | N/A | Re-inspection required |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1024-01911
Permit Description: WO T105204 - Replacing 3-46kV poles and installing 1-4kV pole
Total Completed Inspections - 4
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/28/2025 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
| 04/09/2025 | TRSP - ROW - Barricade - Setup/Routine | Passed | ||
| 04/09/2025 | TRSP - ROW - Backfill - Placement/Compaction | Passed | ||
| 04/09/2025 | TRSP - ROW - Final | Passed |