Permit: TR-UTL-1023-02743
Permit Details
Apply Date:
10/20/2023
Applicant:
Tucson Electric Power
Description:
WO T83612 - Install new J1 and replace existing riser. Revision to scope of work: WO T76429 - INSTALLING PADMOUNTED TRANSFORMER AND UNDERGROUND CABLE. Approved for work within the City of Tucson Right-of-Way only.
Permit Reviews
Permit Number - TR-UTL-1023-02743
Permit Status: Complete
Permit Description: WO T83612 - Install new J1 and replace existing riser.
Revision to scope of work:
WO T76429 - INSTALLING PADMOUNTED TRANSFORMER AND UNDERGROUND CABLE.
Approved for work within the City of Tucson Right-of-Way only.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/20/2023 | RIGHT-OF-WAY REVIEW v.1 | 10/24/2023 | APPROVED |
12/27/2023 | RIGHT-OF-WAY REVIEW v.1 | 01/02/2024 | APPROVED |
Conditions
Permit Number - TR-UTL-1023-02743
Permit Status: Complete
Permit Description: WO T83612 - Install new J1 and replace existing riser.
Revision to scope of work:
WO T76429 - INSTALLING PADMOUNTED TRANSFORMER AND UNDERGROUND CABLE.
Approved for work within the City of Tucson Right-of-Way only.
Date | Description | Comments |
---|---|---|
10/20/2023 | ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. | |
10/20/2023 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1023-02743
Permit Description: WO T83612 - Install new J1 and replace existing riser.
Revision to scope of work:
WO T76429 - INSTALLING PADMOUNTED TRANSFORMER AND UNDERGROUND CABLE.
Approved for work within the City of Tucson Right-of-Way only.
Total Completed Inspections - 2
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/21/2024 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
02/16/2024 | TRSP - ROW - SITE INSPECTION | Passed |