Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
2753 S WILMOT RD
Apply Date:
10/20/2023
Applicant:
ANGEL MORALES
Description:
3230X9 Site 1 and 2 - Install Approximately 607 LF of 12" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collar on MH 8139-24 per PCRWRD STD DTL 212 and manhole bench rehabilitation will be completed on MH's 8139-23 and 4281-01 per PCRWRD STD DTL 302.... Revision - 12/06/2023 - Change Traffic Control to keep up 24 hrs. Due to sewer bypass placement, closure needs to stay up and in place. Work will be kept to daylight hours only.

Permit Reviews

Permit Number - TR-UTL-1023-02740
Permit Status: Complete
Permit Description: 3230X9 Site 1 and 2 - Install Approximately 607 LF of 12" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collar on MH 8139-24 per PCRWRD STD DTL 212 and manhole bench rehabilitation will be completed on MH's 8139-23 and 4281-01 per PCRWRD STD DTL 302.... Revision - 12/06/2023 - Change Traffic Control to keep up 24 hrs. Due to sewer bypass placement, closure needs to stay up and in place. Work will be kept to daylight hours only.
Start Date Submittal Complete Date Status  
12/06/2023 RIGHT-OF-WAY REVIEW v.1 12/06/2023 APPROVED Review Details
10/20/2023 RIGHT-OF-WAY REVIEW v.1 10/23/2023 REQUIRES RESUBMIT Review Details
10/27/2023 RIGHT-OF-WAY REVIEW v.3 11/08/2023 APPROVED Review Details
10/23/2023 RIGHT-OF-WAY REVIEW v.2 10/24/2023 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1023-02740
Permit Status: Complete
Permit Description: 3230X9 Site 1 and 2 - Install Approximately 607 LF of 12" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collar on MH 8139-24 per PCRWRD STD DTL 212 and manhole bench rehabilitation will be completed on MH's 8139-23 and 4281-01 per PCRWRD STD DTL 302.... Revision - 12/06/2023 - Change Traffic Control to keep up 24 hrs. Due to sewer bypass placement, closure needs to stay up and in place. Work will be kept to daylight hours only.
Total Outstanding Activity Conditions - 2
Date Name
10/20/2023 Traffic control set-up approved between 9AM - 3:30PM
10/23/2023 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-1023-02740
Permit Description: 3230X9 Site 1 and 2 - Install Approximately 607 LF of 12" Cured in Place Pipe. The Cured in Place Pipe is a trench-less technology for sewer rehabilitation and does NOT require disturbance of the earth. New concrete collar on MH 8139-24 per PCRWRD STD DTL 212 and manhole bench rehabilitation will be completed on MH's 8139-23 and 4281-01 per PCRWRD STD DTL 302.... Revision - 12/06/2023 - Change Traffic Control to keep up 24 hrs. Due to sewer bypass placement, closure needs to stay up and in place. Work will be kept to daylight hours only.
Total Completed Inspections - 3
Date Description Inspector Results Comments
12/15/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
12/15/2023 TRSP - ROW - Recurring Passed
12/28/2023 TRSP - ROW - Final/Close-Out Passed

Documents

File Name Document Type  
3230X9 - SITE 1 AND 2 FMP MAP (2830 S WILMOT RD) - R2_V3.PDF DOCUMENTS VIEW
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW