Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
5115 E VALENCIA RD
Apply Date:
10/11/2023
Applicant:
Cox Communications
Description:
PRJ259149-1: Bore 110' to install new CATV conduit & pull thru 1,191' of existing CATV conduit for system tie.

Permit Reviews

Permit Number - TR-UTL-1023-02675
Permit Status: Complete
Permit Description: PRJ259149-1: Bore 110' to install new CATV conduit & pull thru 1,191' of existing CATV conduit for system tie.
Start Date Submittal Complete Date Status  
10/16/2023 RIGHT-OF-WAY REVIEW v.1 10/25/2023 APPROVED Review Details

Conditions

Permit Number - TR-UTL-1023-02675
Permit Status: Complete
Permit Description: PRJ259149-1: Bore 110' to install new CATV conduit & pull thru 1,191' of existing CATV conduit for system tie.
Date Description Comments
10/16/2023 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL. **SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
10/16/2023 Traffic control set-up approved between 9AM - 3:30PM
10/25/2023 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-1023-02675
Permit Description: PRJ259149-1: Bore 110' to install new CATV conduit & pull thru 1,191' of existing CATV conduit for system tie.
Total Completed Inspections - 3
Date Description Inspector Results Comments
01/23/2024 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
02/06/2024 TRSP - ROW - Recurring Passed
02/22/2024 TRSP - ROW - Final/Close-Out Passed