Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address:
949 E 2ND ST
Apply Date:
10/11/2023
Applicant:
Think Safety Inc
Description:
COX TO PULL THRU 580' OF EXISTING CONDUIT FOR SYSTEM TIE

Permit Reviews

Permit Number - TR-UTL-1023-02670
Permit Status: Complete
Permit Description: COX TO PULL THRU 580' OF EXISTING CONDUIT FOR SYSTEM TIE
Start Date Submittal Complete Date Status  
10/13/2023 RIGHT-OF-WAY REVIEW v.1 10/18/2023 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-1023-02670
Permit Status: Complete
Permit Description: COX TO PULL THRU 580' OF EXISTING CONDUIT FOR SYSTEM TIE
Total Outstanding Activity Conditions - 4
Date Name
10/13/2023 Traffic Control set-up approved between 7AM - 5PM
10/13/2023 Work may require T Meter Hooding. Send an email to Park Tucson to advise them of this work.
10/13/2023 Pavement Patch type Shall Be in conformance to the current edition of the City of Tucson Public Utility Administrative Manual.
10/13/2023 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-1023-02670
Permit Description: COX TO PULL THRU 580' OF EXISTING CONDUIT FOR SYSTEM TIE
Total Completed Inspections - 2
Date Description Inspector Results Comments
11/22/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
01/31/2024 TRSP - ROW - Final/Close-Out Passed

Documents

File Name Document Type  
COT - TR - ROW PERMIT.PDF DOCUMENTS VIEW
PRJ259713-1 PLANS_V1.PDF DOCUMENTS VIEW
PRJ259713-1 TCP_V1.PDF DOCUMENTS VIEW