Permit: TR-UTL-1023-02639
Permit Details
Apply Date:
10/05/2023
Applicant:
Tucson Electric Power
Description:
WO T23422. TEP crews to park in the City of Tucson ROW on the north side of E Littletown Rd to pull cable in customer provided conduit and perform all necessary work to terminate cables inside TEP new and existing equipment.
Permit Reviews
Permit Number - TR-UTL-1023-02639
Permit Status: Complete
Permit Description: WO T23422. TEP crews to park in the City of Tucson ROW on the north side of E Littletown Rd to pull cable in customer provided conduit and perform all necessary work to terminate cables inside TEP new and existing equipment.
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/05/2023 | RIGHT-OF-WAY REVIEW v.1 | 10/06/2023 | REQUIRES RESUBMIT |
10/13/2023 | RIGHT-OF-WAY REVIEW v.2 | 10/16/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-1023-02639
Permit Status: Complete
Permit Description: WO T23422. TEP crews to park in the City of Tucson ROW on the north side of E Littletown Rd to pull cable in customer provided conduit and perform all necessary work to terminate cables inside TEP new and existing equipment.
Total Outstanding Activity Conditions - 3
Date | Name |
---|---|
08/11/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
08/11/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
10/06/2023 | Traffic control set-up approved between 9AM - 3:30PM |
Completed Inspections
Permit Status: Complete
Permit Number: TR-UTL-1023-02639
Permit Description: WO T23422. TEP crews to park in the City of Tucson ROW on the north side of E Littletown Rd to pull cable in customer provided conduit and perform all necessary work to terminate cables inside TEP new and existing equipment.
Total Completed Inspections - 3
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/20/2023 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | ||
02/20/2024 | TRSP - ROW - Recurring | Passed | ||
04/22/2024 | TRSP - ROW - Final/Close-Out | Passed |