Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.

Permit Details

Status:
Complete
Type:
Right-of-Way (ROW) - Utility
Address NEW:
707 N ALVERNON WY
Apply Date:
10/28/2022
Applicant:
BOB LAPRATH
Description:
WO# 980912-Transfer 2 main cable attachments,Install bonding assembly,cable tag,pole marking.

Permit Reviews

Permit Number - TR-UTL-1022-00024
Permit Status: Complete
Permit Description: WO# 980912-Transfer 2 main cable attachments,Install bonding assembly,cable tag,pole marking.
Start Date Submittal Complete Date Status  
11/15/2022 RIGHT-OF-WAY REVIEW v.1 11/16/2022 APPROVED Review Details

Conditions

Permit Number - TR-UTL-1022-00024
Permit Status: Complete
Permit Description: WO# 980912-Transfer 2 main cable attachments,Install bonding assembly,cable tag,pole marking.
Date Description Comments
11/15/2022 ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRATIVE MANUAL.
11/16/2022 Traffic control set-up approved between 9AM - 3:30PM

Completed Inspections

Permit Status: Complete
Permit Number: TR-UTL-1022-00024
Permit Description: WO# 980912-Transfer 2 main cable attachments,Install bonding assembly,cable tag,pole marking.
Total Completed Inspections - 3
Date Description Inspector Results Comments
09/05/2023 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed
09/05/2023 TRSP - ROW - Recurring Passed
09/05/2023 TRSP - ROW - Final/Close-Out Passed