Permit: TR-UTL-0926-01694
Permit Details
Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address:
3038 E FORT LOWELL RD
Address NEW:
3038 E FORT LOWELL RD
Apply Date:
09/30/2026
Applicant:
Cox Communications
Description:
Cox to pull 50' of fiber through existing conduit for catv commercial business tie.
Permit Reviews
Permit Number - TR-UTL-0926-01694
Permit Status: Needs resubmittal
Permit Description: Cox to pull 50' of fiber through existing conduit for catv commercial business tie.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/30/2026 | RIGHT-OF-WAY REVIEW v.1 | 10/20/2026 | REQUIRES RESUBMIT |
| 10/26/2026 | RIGHT-OF-WAY REVIEW v.2 | 10/28/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0926-01694
Permit Status: Needs resubmittal
Permit Description: Cox to pull 50' of fiber through existing conduit for catv commercial business tie.
Total Outstanding Activity Conditions - 8
| Date | Name |
|---|---|
| 10/05/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION. |
| 10/05/2026 | A NOTICE OF TEMPORARY HOLIDAY RESTRICTION applies to this permit and will be effect from NOV 23rd to January 3rd. Due to increase traffic volume on many of the city roads, its necessary to restrict lane closures on certain roads during the Gem Show. |
| 10/05/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 10/05/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 10/05/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 10/05/2026 | PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 10/27/2026 | Business Access The contractor shall always maintain safe and continuous access to all adjacent businesses during construction. |
| 10/27/2026 | Lane and street closures shall be permitted only during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four-hour lane closures are not permitted unless specifically approved by the City. Traffic control devices shall not be stored in a bike lane or sidewalk. |