Permit: TR-UTL-0926-01692
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
4440 E GRANT RD
Address NEW:
4440 E GRANT RD
Apply Date:
09/30/2026
Applicant:
Austin Eslick
Description:
WO T181403 - TEP WILL BE WORKING IN ROW TO INSTALL OVERHEAD EQUIPMENT ON EXISTING POLE 360 WITH NEW RISER AND CONDUCTOR IN EXISTING CONDUIT ALONG BACK OF SIDEWALK TO NEW METER LOCATION FOR NEW CITY LIGHTING METER. CONDUIT WAS INSTALLED BY CITY GENERAL CONTRACTOR ON 5TH STREET PUBLIC IMPROVEMENT.
Permit Reviews
Permit Number - TR-UTL-0926-01692
Permit Status: Inspections
Permit Description: WO T181403 - TEP WILL BE WORKING IN ROW TO INSTALL OVERHEAD EQUIPMENT ON EXISTING POLE 360 WITH NEW RISER AND CONDUCTOR IN EXISTING CONDUIT ALONG BACK OF SIDEWALK TO NEW METER LOCATION FOR NEW CITY LIGHTING METER. CONDUIT WAS INSTALLED BY CITY GENERAL CONTRACTOR ON 5TH STREET PUBLIC IMPROVEMENT.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/30/2026 | RIGHT-OF-WAY REVIEW v.1 | 10/25/2026 | REQUIRES RESUBMIT |
| 10/26/2026 | RIGHT-OF-WAY REVIEW v.2 | 10/30/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0926-01692
Permit Status: Inspections
Permit Description: WO T181403 - TEP WILL BE WORKING IN ROW TO INSTALL OVERHEAD EQUIPMENT ON EXISTING POLE 360 WITH NEW RISER AND CONDUCTOR IN EXISTING CONDUIT ALONG BACK OF SIDEWALK TO NEW METER LOCATION FOR NEW CITY LIGHTING METER. CONDUIT WAS INSTALLED BY CITY GENERAL CONTRACTOR ON 5TH STREET PUBLIC IMPROVEMENT.
Total Outstanding Activity Conditions - 9
| Date | Name |
|---|---|
| 10/01/2026 | Bus Stop/Route |
| 10/01/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 10/01/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 10/01/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 10/01/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 10/30/2026 | Bike Lane Access and Accommodation 1) Posted Speeds 30 Mph or Less – Less than 14 lane - Use of the R4-11 alone is acceptable and preferred over Share The Road sign - 2) Posted Speeds 30 Mph or less – greater than 14 lane - Use of Share The Road sign is preferred 3) Posted Speeds 30 Mph or More – Any Lane Size - Provide a reasonable alternative for cyclists, such as a paved path, space behind barricades, or bike detour. Acceptable to direct cyclists to the sidewalk when properly signed depending on conditions 4) Bike lane to be maintained within Traffic Control closure and Share may Pedestrian detour path with proper R9-6 Sign. |
| 10/30/2026 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 10/30/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 10/30/2026 | DTM Project Rob Lane Manager Notes |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0926-01692
Permit Description: WO T181403 - TEP WILL BE WORKING IN ROW TO INSTALL OVERHEAD EQUIPMENT ON EXISTING POLE 360 WITH NEW RISER AND CONDUCTOR IN EXISTING CONDUIT ALONG BACK OF SIDEWALK TO NEW METER LOCATION FOR NEW CITY LIGHTING METER. CONDUIT WAS INSTALLED BY CITY GENERAL CONTRACTOR ON 5TH STREET PUBLIC IMPROVEMENT.
Total Completed Inspections - 1
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/05/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed |