Permit Details

Status:
In Review
Type:
Right-of-Way (ROW) - Utility
Address:
5707 E 29TH ST
Address NEW:
5707 E 29TH ST
Apply Date:
09/26/2026
Applicant:
Kyle Day
Description:
WOs T87054, T171401, T175187. Crews to park in the City of Tucson ROW to replace (7) TEP/TELCO poles, OH conductors, OH attachments, (6) 1Ø UG Transformers, (5) 1Ø OH Transformers. Install (2) Down guy anchors. Install (1) New TEP Pole, (1) 1500kva Conversion Bank, and (1) 1Ø OH Transformer.

Permit Reviews

Permit Number - TR-UTL-0926-01673
Permit Status: In review
Permit Description: WOs T87054, T171401, T175187. Crews to park in the City of Tucson ROW to replace (7) TEP/TELCO poles, OH conductors, OH attachments, (6) 1Ø UG Transformers, (5) 1Ø OH Transformers. Install (2) Down guy anchors. Install (1) New TEP Pole, (1) 1500kva Conversion Bank, and (1) 1Ø OH Transformer.
Start Date Submittal Complete Date Status  
09/28/2026 RIGHT-OF-WAY REVIEW v.1 N/A IN REVIEW Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0926-01673
Permit Status: In review
Permit Description: WOs T87054, T171401, T175187. Crews to park in the City of Tucson ROW to replace (7) TEP/TELCO poles, OH conductors, OH attachments, (6) 1Ø UG Transformers, (5) 1Ø OH Transformers. Install (2) Down guy anchors. Install (1) New TEP Pole, (1) 1500kva Conversion Bank, and (1) 1Ø OH Transformer.
Total Outstanding Activity Conditions - 6
Date Name
09/29/2026 Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced.
09/29/2026 Bus Stop/Route
09/29/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
09/29/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
09/29/2026 Traffic control set-up approved between 9AM - 3:30PM
09/29/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.