Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address NEW:
1195 W IRVINGTON RD
Apply Date:
09/25/2026
Applicant:
ANGEL MORALES
Description:
P.188628 -BORE 340', TRENCH 348' TO REMOVE EXISTING STRUCTURE , PLACE 1 NEW PED, & 1 NEW HH AND REMOVE CABLE FROM CONDUIT, REMOVE HH AND SPLCE FIBER *Previously approved under expired permits TR-UTL-0126-00081 & TR-UTL-0725-01081

Permit Reviews

Permit Number - TR-UTL-0926-01662
Permit Status: Needs resubmittal
Permit Description: P.188628 -BORE 340', TRENCH 348' TO REMOVE EXISTING STRUCTURE , PLACE 1 NEW PED, & 1 NEW HH AND REMOVE CABLE FROM CONDUIT, REMOVE HH AND SPLCE FIBER *Previously approved under expired permits TR-UTL-0126-00081 & TR-UTL-0725-01081
Start Date Submittal Complete Date Status  
09/25/2026 RIGHT-OF-WAY REVIEW v.1 10/13/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0926-01662
Permit Status: Needs resubmittal
Permit Description: P.188628 -BORE 340', TRENCH 348' TO REMOVE EXISTING STRUCTURE , PLACE 1 NEW PED, & 1 NEW HH AND REMOVE CABLE FROM CONDUIT, REMOVE HH AND SPLCE FIBER *Previously approved under expired permits TR-UTL-0126-00081 & TR-UTL-0725-01081
Total Outstanding Activity Conditions - 5
Date Name
09/29/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
09/29/2026 Traffic control set-up approved between 9AM - 3:30PM
09/29/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
09/29/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
09/29/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.