Permit: TR-UTL-0926-01646
Permit Details
Apply Date:
09/23/2026
Applicant:
Blair Montello
Description:
E.1600.0030866 ACCESSING (2) EXISTING HH AND (1) EXISTING MH TO SPLICE FIBER. DIG (2) 2X2 BORE PIT. R&R 4 SQFT OF ASPHALT. BORE NEW FUTUREPATH AND JET NEW 144CT MICROFIBER FROM EXISTING MH TO EXISTING HH (245') This project is for Lumen and will not be conveyed to any other company.
Permit Reviews
Permit Number - TR-UTL-0926-01646
Permit Status: Issued
Permit Description: E.1600.0030866 ACCESSING (2) EXISTING HH AND (1) EXISTING MH TO SPLICE FIBER. DIG (2) 2X2 BORE PIT. R&R 4 SQFT OF ASPHALT. BORE NEW FUTUREPATH AND JET NEW 144CT MICROFIBER FROM EXISTING MH TO EXISTING HH (245')
This project is for Lumen and will not be conveyed to any other company.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/24/2026 | RIGHT-OF-WAY REVIEW v.1 | 10/16/2026 | REQUIRES RESUBMIT |
| 10/22/2026 | RIGHT-OF-WAY REVIEW v.2 | 10/26/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0926-01646
Permit Status: Issued
Permit Description: E.1600.0030866 ACCESSING (2) EXISTING HH AND (1) EXISTING MH TO SPLICE FIBER. DIG (2) 2X2 BORE PIT. R&R 4 SQFT OF ASPHALT. BORE NEW FUTUREPATH AND JET NEW 144CT MICROFIBER FROM EXISTING MH TO EXISTING HH (245')
This project is for Lumen and will not be conveyed to any other company.
Total Outstanding Activity Conditions - 9
| Date | Name |
|---|---|
| 09/28/2026 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office at PDSDHistoric@tucsonaz.gov. |
| 09/28/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 09/28/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 09/28/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 09/28/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 10/26/2026 | All boring operations shall comply with approved plans, permit conditions, and applicable City standards. Contractor shall verify existing utilities, maintain required clearances, provide proper traffic control, protect existing ROW improvements, and restore all disturbed areas to City standards. Any deviations from approved plans require prior ROW Engineering approval. |
| 10/26/2026 | All excavations shall be secured for safety at the end of each shift. If pedestrian access cannot be maintained, a temporary protected pedestrian route shall be provided. All open trenches shall be protected by Type II barricades with Type A flashers and surrounded by a barrier fence. Trenches deeper than 4 feet shall be surrounded by chain-link fence. Excavations may need to be covered with steel plates or other approved materials at the end of each shift. |
| 10/26/2026 | Lane and street closures shall be permitted only during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four-hour lane closures are not permitted unless specifically approved by the City. Traffic control devices shall not be stored in a bike lane or sidewalk. |
| 10/26/2026 | Speedway Bl is under holiday restriction from the week of Thanksgiving through January 2. No work requiring barricades in the ROW shall occur within the restricted limits during this period |