Permit: TR-UTL-0926-01642
Permit Details
Status:
Fees Due
Type:
Right-of-Way (ROW) - Utility
Address:
6225 E SPEEDWAY BL
Address NEW:
6225 E SPEEDWAY BL
Apply Date:
09/23/2026
Applicant:
Adrien Pineda
Description:
ARIZONA PIPELINE WILL NEED TO EXCAVATE (1)10'X3' BELL HOLE IN THE ASPHALT ROW IN ORDER TO ABANDON THE EXISTING GAS SERVICE FOR 6225 E SPEEDWAY BLVD
Permit Reviews
Permit Number - TR-UTL-0926-01642
Permit Status: Fees due
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (1)10'X3' BELL HOLE IN THE ASPHALT ROW IN ORDER TO ABANDON THE EXISTING GAS SERVICE FOR 6225 E SPEEDWAY BLVD
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/24/2026 | RIGHT-OF-WAY REVIEW v.1 | 09/28/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0926-01642
Permit Status: Fees due
Permit Description: ARIZONA PIPELINE WILL NEED TO EXCAVATE (1)10'X3' BELL HOLE IN THE ASPHALT ROW IN ORDER TO ABANDON THE EXISTING GAS SERVICE FOR 6225 E SPEEDWAY BLVD
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 09/24/2026 | **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 09/24/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 09/28/2026 | BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 72-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION WITH jose.garcia@tucsonaz.gov.. Due to the presence of a bus stop in the area, the contractor is required to contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 no less than 72 business hours before beginning work to coordinate impacts. |
| 09/28/2026 | Lane closures shall only be permitted during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four (24) hour lane closures are not permitted unless specifically approved by the City. Traffic Control Devices shall not be stored in the bike lane or sidewalk - The contractor shall restore all disturbed pavement in accordance with the City of Tucson Standard Specifications for Public Improvements and applicable standard details. All pavement patches shall match the existing pavement section and surface condition. The contractor shall maintain all temporary patches in a safe and drivable condition until permanent restoration is completed. Any settlement, cracking, or pavement failure within the patched area shall be repaired by the contractor at no cost to the City for the duration of the warranty period All excavations must be securely plated or backfilled at the end of each workday and during any period when the site is unattended. Plating shall be traffic-rated, flush with the surrounding surface, and properly secured to prevent movement and to maintain public safety |