Permit Details

Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address NEW:
1303 S VAN BUREN AV
Apply Date:
09/16/2026
Applicant:
Arnulfo Quiroz
Description:
WO T159033. Crews to park in the City of Tucson ROW to replace (15) TEP poles, OH conductors, and OH attachments. Down guy anchors are to be replaced at (2) pole locations. Total Work days: 52 days.

Permit Reviews

Permit Number - TR-UTL-0926-01603
Permit Status: Needs resubmittal
Permit Description: WO T159033. Crews to park in the City of Tucson ROW to replace (15) TEP poles, OH conductors, and OH attachments. Down guy anchors are to be replaced at (2) pole locations. Total Work days: 52 days.
Start Date Submittal Complete Date Status  
09/16/2026 RIGHT-OF-WAY REVIEW v.1 N/A REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0926-01603
Permit Status: Needs resubmittal
Permit Description: WO T159033. Crews to park in the City of Tucson ROW to replace (15) TEP poles, OH conductors, and OH attachments. Down guy anchors are to be replaced at (2) pole locations. Total Work days: 52 days.
Total Outstanding Activity Conditions - 7
Date Name
09/17/2026 Traffic Control set-up approved between 7AM - 5PM
09/17/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
09/17/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
09/17/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
10/02/2026 All excavations shall be secured for safety at the end of each shift. If pedestrian access cannot be maintained, a temporary protected pedestrian route shall be provided. All open trenches shall be protected by Type II barricades with Type A flashers and surrounded by a barrier fence. Trenches deeper than 4 feet shall be surrounded by chain-link fence. Excavations may need to be covered with steel plates or other approved materials at the end of each shift.
10/02/2026 Equipment or poles shall not be stored unattended within the ROW without approved barricades and safety delineation. Equipment or poles left overnight or for extended periods shall be properly secured and protected to prevent hazards to pedestrians, bicyclists, and motorists.
10/02/2026 The contractor shall not block driveways or restrict resident access without prior notification and shall coordinate directly with affected property owners as necessary