Permit Details

Status:
Withdrawn
Type:
Right-of-Way (ROW) - Utility
Address:
5424 E PIMA ST
Address NEW:
5424 E PIMA ST
Apply Date:
09/16/2026
Applicant:
ANGEL MORALES
Description:
P.399225 - REMOVE-REPLACE 33 SQFT ASPHALT, BORE 1170FT TOTAL WITH NEW FP AND JET NEW 72CT MIRCRO FIBER, AND MH ACCESS FOR SPLICING *This was previously approved under permit # TR-UTL-0526-00846 *This project is for Lumen and will not be conveyed to any other company.* ** PERMIT WITHDRAWN AS OF 10/27/2026 **

Permit Reviews

Permit Number - TR-UTL-0926-01601
Permit Status: Withdrawn
Permit Description: P.399225 - REMOVE-REPLACE 33 SQFT ASPHALT, BORE 1170FT TOTAL WITH NEW FP AND JET NEW 72CT MIRCRO FIBER, AND MH ACCESS FOR SPLICING *This was previously approved under permit # TR-UTL-0526-00846 *This project is for Lumen and will not be conveyed to any other company.* ** PERMIT WITHDRAWN AS OF 10/27/2026 **
Start Date Submittal Complete Date Status  
10/21/2026 RIGHT-OF-WAY REVIEW v.2 10/25/2026 REQUIRES RESUBMIT Review Details
09/16/2026 RIGHT-OF-WAY REVIEW v.1 10/20/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0926-01601
Permit Status: Withdrawn
Permit Description: P.399225 - REMOVE-REPLACE 33 SQFT ASPHALT, BORE 1170FT TOTAL WITH NEW FP AND JET NEW 72CT MIRCRO FIBER, AND MH ACCESS FOR SPLICING *This was previously approved under permit # TR-UTL-0526-00846 *This project is for Lumen and will not be conveyed to any other company.* ** PERMIT WITHDRAWN AS OF 10/27/2026 **
Total Outstanding Activity Conditions - 6
Date Name
09/21/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
09/21/2026 Traffic control set-up approved between 9AM - 3:30PM
09/21/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
09/21/2026 N Woodland Av is subject to a pavement moratorium. Any disturbance of existing asphalt will require pavement restoration in accordance with the current City of Tucson Public Utility Administrative Manual. A 2-inch mill and overlay covering one-half the width of the roadway shall be required. The final pavement restoration limits shall be confirmed by the ROW inspector at the preconstruction meeting.
09/21/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
09/21/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.