Permit Details

Status:
Approved
Type:
Right-of-Way (ROW) - Utility
Address NEW:
701 W CONGRESS ST
Apply Date:
09/15/2026
Applicant:
ANGEL MORALES
Description:
P.376986 - 1.25' ID WITH 24CT NON-SHIELDED FIBER FROM EXISTING MH_5045 TO NEW 30X38 HH_5095. INTERCEPT AND OVERSET ONTO EXISTING CUSTOMER PLACED CBO AND PLACE A NEW 30X48 HH_5095. PULL (25’) OF 1.25" ID WITH 24CT NON-SHIELDED FIBER FROM NEW 30X48 HH_5095 TO POE. PULL (10') OF 1.25'' ID WITH 24CT NON-SHIELDED FIBER FROM POE TO MPOP THROUGH CUSTOMER PLACED CBO. PLACE NEW 24 PORT FDP AND CIENA 3924 ON CUSTOMER PLACED BACKBOARD ONTO WEST WALL IN MPOP/CPE ROOM (SERVER ROOM, SOUTHEAST CORNER OF BUILDING). *This project is for Lumen and will not be conveyed to any other company. *Previously approved under TR-UTL-0326-00453

Permit Reviews

Permit Number - TR-UTL-0926-01592
Permit Status: Approved
Permit Description: P.376986 - 1.25' ID WITH 24CT NON-SHIELDED FIBER FROM EXISTING MH_5045 TO NEW 30X38 HH_5095. INTERCEPT AND OVERSET ONTO EXISTING CUSTOMER PLACED CBO AND PLACE A NEW 30X48 HH_5095. PULL (25’) OF 1.25" ID WITH 24CT NON-SHIELDED FIBER FROM NEW 30X48 HH_5095 TO POE. PULL (10') OF 1.25'' ID WITH 24CT NON-SHIELDED FIBER FROM POE TO MPOP THROUGH CUSTOMER PLACED CBO. PLACE NEW 24 PORT FDP AND CIENA 3924 ON CUSTOMER PLACED BACKBOARD ONTO WEST WALL IN MPOP/CPE ROOM (SERVER ROOM, SOUTHEAST CORNER OF BUILDING). *This project is for Lumen and will not be conveyed to any other company. *Previously approved under TR-UTL-0326-00453
Start Date Submittal Complete Date Status  
09/16/2026 RIGHT-OF-WAY REVIEW v.1 10/09/2026 REQUIRES RESUBMIT Review Details
10/25/2026 RIGHT-OF-WAY REVIEW v.2 10/30/2026 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0926-01592
Permit Status: Approved
Permit Description: P.376986 - 1.25' ID WITH 24CT NON-SHIELDED FIBER FROM EXISTING MH_5045 TO NEW 30X38 HH_5095. INTERCEPT AND OVERSET ONTO EXISTING CUSTOMER PLACED CBO AND PLACE A NEW 30X48 HH_5095. PULL (25’) OF 1.25" ID WITH 24CT NON-SHIELDED FIBER FROM NEW 30X48 HH_5095 TO POE. PULL (10') OF 1.25'' ID WITH 24CT NON-SHIELDED FIBER FROM POE TO MPOP THROUGH CUSTOMER PLACED CBO. PLACE NEW 24 PORT FDP AND CIENA 3924 ON CUSTOMER PLACED BACKBOARD ONTO WEST WALL IN MPOP/CPE ROOM (SERVER ROOM, SOUTHEAST CORNER OF BUILDING). *This project is for Lumen and will not be conveyed to any other company. *Previously approved under TR-UTL-0326-00453
Total Outstanding Activity Conditions - 11
Date Name
09/21/2026 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to the Historic Preservation Office, City of Tucson, PO BOX 27210, Tucson AZ 85726...***Please contact Historic Preservation Office at PDSDHistoric@tucsonaz.gov.
09/21/2026 BUS STOP IN THE AREA, CONTACT SUN TRAN DISPATCH, AT 520-206-8934 AT LEAST 48-BUSINESS HOURS PRIOR TO START OF WORK FOR COORDINATION.
09/21/2026 Traffic control set-up approved between 9AM - 3:30PM
09/21/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
09/21/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
09/21/2026 PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
10/26/2026 All excavations shall be secured for safety at the end of each shift. If pedestrian access cannot be maintained, a temporary protected pedestrian route shall be provided. All open trenches shall be protected by Type II barricades with Type A flashers and surrounded by a barrier fence. Trenches deeper than 4 feet shall be surrounded by chain-link fence. Excavations may need to be covered with steel plates or other approved materials at the end of each shift.
10/26/2026 Any sidewalk, curb, curb and gutter, or other public improvements removed, damaged, undermined, or disturbed by the proposed work shall be removed and replaced in accordance with current City of Tucson standards and specifications. Sidewalk replacement shall be to full panel/joint limits; partial panel replacement is not permitted. Match existing line, grade, width, and cross slope while maintaining all applicable accessibility requirements. Restore all disturbed areas within the public right-of-way to equal or better condition.
10/26/2026 Continuous ADA-compliant pedestrian access shall be maintained at all times. If a sidewalk is closed, an approved temporary pedestrian access route shall be provided in accordance with the Manual on Uniform Traffic Control Devices.
10/26/2026 Lane and street closures shall be permitted only during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four-hour lane closures are not permitted unless specifically approved by the City. Traffic control devices shall not be stored in a bike lane or sidewalk.
10/26/2026 W Congress St is under holiday restriction from the week of Thanksgiving through January 2. No work requiring barricades in the ROW shall occur within the restricted limits during this period

Documents

File Name Document Type  
P.376986 TUCSON TCP UPDATED_V2.PDF DOCUMENTS VIEW
DESIGN PLAN-P.376986-TUCSON-PLANS-C1_V1.PDF DOCUMENTS VIEW
P.376986-AERIAL MAP_V1.PDF DOCUMENTS VIEW