Permit: TR-UTL-0926-01587
Permit Details
Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
4205 S QUEEN PALM DR
Address NEW:
4205 S QUEEN PALM DR
Apply Date:
09/15/2026
Applicant:
Description:
We are going to be potholing for utilities in 2 locations: 1. Intersection of S Heather Place/S Queen Palm Dr 2. Intersection of E Dogwood St/S White Pine Dr
Permit Reviews
Permit Number - TR-UTL-0926-01587
Permit Status: Inspections
Permit Description: We are going to be potholing for utilities in 2 locations:
1. Intersection of S Heather Place/S Queen Palm Dr
2. Intersection of E Dogwood St/S White Pine Dr
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/22/2026 | RIGHT-OF-WAY REVIEW v.2 | 10/01/2026 | APPROVED |
| 09/16/2026 | RIGHT-OF-WAY REVIEW v.1 | 09/22/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0926-01587
Permit Status: Inspections
Permit Description: We are going to be potholing for utilities in 2 locations:
1. Intersection of S Heather Place/S Queen Palm Dr
2. Intersection of E Dogwood St/S White Pine Dr
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 09/22/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 09/22/2026 | PAVEMENT MORATORIUM |
| 09/22/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 09/22/2026 | Traffic Control set-up approved between 7AM - 5PM |
Completed Inspections
Permit Status: Inspections
Permit Number: TR-UTL-0926-01587
Permit Description: We are going to be potholing for utilities in 2 locations:
1. Intersection of S Heather Place/S Queen Palm Dr
2. Intersection of E Dogwood St/S White Pine Dr
Total Completed Inspections - 2
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/12/2026 | TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting | Passed | onsite meeting with Desert Earth. Potholes will be in moratorium pavement and follow SD 219. Flyers still needed for neighborhood notification. Mobilization will be scheduled after flyers. Shared Jeremy G’s contact info for future inspections. | |
| 10/27/2026 | TRSP - ROW - Barricade - Setup/Routine | Passed | Work is complete and traffic control has been removed. |