Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address NEW:
926 W DISTRICT ST
Apply Date:
09/11/2026
Applicant:
Brittany West
Description:
phase 6, hang 5,232ft of new strand and new 144ct fiber.

Permit Reviews

Permit Number - TR-UTL-0926-01561
Permit Status: Needs resubmittal
Permit Description: phase 6, hang 5,232ft of new strand and new 144ct fiber.
Start Date Submittal Complete Date Status  
10/21/2026 RIGHT-OF-WAY REVIEW v.2 10/22/2026 REQUIRES RESUBMIT Review Details
09/11/2026 RIGHT-OF-WAY REVIEW v.1 10/20/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0926-01561
Permit Status: Needs resubmittal
Permit Description: phase 6, hang 5,232ft of new strand and new 144ct fiber.
Total Outstanding Activity Conditions - 8
Date Name
09/17/2026 The following extended traffic control set-up times were approved: 24 hours
09/17/2026 Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced.
09/17/2026 Bus Stop/Route
09/17/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
09/17/2026 PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTAINED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. SIDEWALK CLOSED AHEAD SIGNS SHALL BE PLACED AT THE NEAREST ADA ACCESS RAMPS PER MUTCD CHAPTER 6D.
09/17/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
09/17/2026 Traffic control set-up approved between 9AM - 3:30PM
09/17/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Documents

File Name Document Type  
DESIGN PLAN-ENGINEERING DRAFT-A1_V1 (2).PDF DOCUMENTS VIEW
JB0002329112_PERMIT MAP_V1 (1).PDF DOCUMENTS VIEW
MASTEC CITY_V1.PDF DOCUMENTS VIEW