Permit Details

Status:
In Review
Type:
Right-of-Way (ROW) - Utility
Address:
1615 E 2ND ST
Address NEW:
1615 E 2ND ST
Apply Date:
09/08/2026
Applicant:
Brittany West
Description:
Place 310' of new strand over 2 spans. Lash 310' of 288ct fiber over 3 spans. Place 1 new riser. install anchor going east and 1 going north. Bore 580' of 2" conduit at a depth of 3', run 580' of 288ct. Place 1 Ped and 1 vault. Bore 400' of 2" conduit at a depth of 3', run 400' of 288ct. Bore 500' of 2" conduit at a depth of 3', run 500' of 288ct. Place 1 Ped and 2 vaults. Place 2640' of new strand over 2 spans. Lash 2640' of 288ct fiber over 20 spans. Place 2 new risers. Install 1 anchor east and 1 west. Approximately halfway through this step is where this permit begins with City of Tucson Right of Way The Following is all within City of Tucson Right of Way Bore 790' of 2" conduit at a depth of 3', run 790' of 288ct. Place 1 Ped and 2 vaults. Place 1540' of new strand over 2 spans. Lash 1540' of 288ct fiber over 13 spans. Place 2 new risers. Install 1 anchor west and 1 east. Bore 1659' of 2" conduit at a depth of 3', run 1669' of 288ct. Place 3 Peds and 3 vaults.

Permit Reviews

Permit Number - TR-UTL-0926-01533
Permit Status: In review
Permit Description: Place 310' of new strand over 2 spans. Lash 310' of 288ct fiber over 3 spans. Place 1 new riser. install anchor going east and 1 going north. Bore 580' of 2" conduit at a depth of 3', run 580' of 288ct. Place 1 Ped and 1 vault. Bore 400' of 2" conduit at a depth of 3', run 400' of 288ct. Bore 500' of 2" conduit at a depth of 3', run 500' of 288ct. Place 1 Ped and 2 vaults. Place 2640' of new strand over 2 spans. Lash 2640' of 288ct fiber over 20 spans. Place 2 new risers. Install 1 anchor east and 1 west. Approximately halfway through this step is where this permit begins with City of Tucson Right of Way The Following is all within City of Tucson Right of Way Bore 790' of 2" conduit at a depth of 3', run 790' of 288ct. Place 1 Ped and 2 vaults. Place 1540' of new strand over 2 spans. Lash 1540' of 288ct fiber over 13 spans. Place 2 new risers. Install 1 anchor west and 1 east. Bore 1659' of 2" conduit at a depth of 3', run 1669' of 288ct. Place 3 Peds and 3 vaults.
Start Date Submittal Complete Date Status  
09/09/2026 RIGHT-OF-WAY REVIEW v.1 N/A IN REVIEW Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0926-01533
Permit Status: In review
Permit Description: Place 310' of new strand over 2 spans. Lash 310' of 288ct fiber over 3 spans. Place 1 new riser. install anchor going east and 1 going north. Bore 580' of 2" conduit at a depth of 3', run 580' of 288ct. Place 1 Ped and 1 vault. Bore 400' of 2" conduit at a depth of 3', run 400' of 288ct. Bore 500' of 2" conduit at a depth of 3', run 500' of 288ct. Place 1 Ped and 2 vaults. Place 2640' of new strand over 2 spans. Lash 2640' of 288ct fiber over 20 spans. Place 2 new risers. Install 1 anchor east and 1 west. Approximately halfway through this step is where this permit begins with City of Tucson Right of Way The Following is all within City of Tucson Right of Way Bore 790' of 2" conduit at a depth of 3', run 790' of 288ct. Place 1 Ped and 2 vaults. Place 1540' of new strand over 2 spans. Lash 1540' of 288ct fiber over 13 spans. Place 2 new risers. Install 1 anchor west and 1 east. Bore 1659' of 2" conduit at a depth of 3', run 1669' of 288ct. Place 3 Peds and 3 vaults.
Total Outstanding Activity Conditions - 8
Date Name
09/10/2026 Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced.
09/10/2026 Bus Stop/Route
09/10/2026 City of Tucson Right of Way Only
09/10/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
09/10/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
09/10/2026 Traffic control set-up approved between 9AM - 3:30PM
09/10/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
09/22/2026 Multiple jurisdictions