Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
5601 E 23RD ST
Address NEW:
5601 E 23RD ST
Apply Date:
09/03/2026
Applicant:
Arnulfo Quiroz
Description:
WO T159092. Crews to park in the City of Tucson ROW to replace (10) TEP poles, OH conductors, and OH attachments. Down guy anchors are to be replaced at (4) pole locations. Total Working days: 55 days.

Permit Reviews

Permit Number - TR-UTL-0926-01517
Permit Status: Inspections
Permit Description: WO T159092. Crews to park in the City of Tucson ROW to replace (10) TEP poles, OH conductors, and OH attachments. Down guy anchors are to be replaced at (4) pole locations. Total Working days: 55 days.
Start Date Submittal Complete Date Status  
10/05/2026 RIGHT-OF-WAY REVIEW v.2 10/09/2026 APPROVED Review Details
09/03/2026 RIGHT-OF-WAY REVIEW v.1 09/30/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0926-01517
Permit Status: Inspections
Permit Description: WO T159092. Crews to park in the City of Tucson ROW to replace (10) TEP poles, OH conductors, and OH attachments. Down guy anchors are to be replaced at (4) pole locations. Total Working days: 55 days.
Total Outstanding Activity Conditions - 5
Date Name
09/08/2026 Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced.
09/08/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
09/08/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
09/08/2026 Traffic control set-up approved between 9AM - 3:30PM
09/08/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.

Completed Inspections

Permit Status: Inspections
Permit Number: TR-UTL-0926-01517
Permit Description: WO T159092. Crews to park in the City of Tucson ROW to replace (10) TEP poles, OH conductors, and OH attachments. Down guy anchors are to be replaced at (4) pole locations. Total Working days: 55 days.
Total Completed Inspections - 1
Date Description Inspector Results Comments
10/15/2026 TRSP - ROW - Pre-Activity Field/Pre-Construction Meeting Passed I spoke with Rudy Villasenor over the phone and he relayed to me that would would still be 2 weeks out because he was still waiting on the ok from his company before bluestakes were even called.

Documents

File Name Document Type  
COT - TR - ROW PERMIT (SSRS).PDF DOCUMENTS VIEW
AERIAL PERMIT MAP_T159092- 17-26 PH2E_V2.PDF DOCUMENTS VIEW
DB 72222 - 5601 E 23RD ST - ALLEY FLAGGER VARIOUS - T159092_V2.PDF DOCUMENTS VIEW