Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

The login landing page when selecting 'View' is still occurring and is still pending further investigation. 

Permit Details

Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address:
5501 E 24TH ST
Address NEW:
5501 E 24TH ST
Apply Date:
09/03/2026
Applicant:
Arnulfo Quiroz
Description:
WOs T163505, T158102. CONVERT 16 SPANS OF OVERHEAD DISTRIBUTION FROM 4KV TO 13.8KV. REPLACE 7 POLE -TYPE TRANSFORMERS WITH 7970 V. POLE EXCAVATIONS 2’X’2’. NO SIDEWALK IMPACT. TOTAL WORKING DAYS: 55.

Permit Reviews

Permit Number - TR-UTL-0926-01515
Permit Status: Needs resubmittal
Permit Description: WOs T163505, T158102. CONVERT 16 SPANS OF OVERHEAD DISTRIBUTION FROM 4KV TO 13.8KV. REPLACE 7 POLE -TYPE TRANSFORMERS WITH 7970 V. POLE EXCAVATIONS 2’X’2’. NO SIDEWALK IMPACT. TOTAL WORKING DAYS: 55.
Start Date Submittal Complete Date Status  
09/03/2026 RIGHT-OF-WAY REVIEW v.1 09/30/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0926-01515
Permit Status: Needs resubmittal
Permit Description: WOs T163505, T158102. CONVERT 16 SPANS OF OVERHEAD DISTRIBUTION FROM 4KV TO 13.8KV. REPLACE 7 POLE -TYPE TRANSFORMERS WITH 7970 V. POLE EXCAVATIONS 2’X’2’. NO SIDEWALK IMPACT. TOTAL WORKING DAYS: 55.
Total Outstanding Activity Conditions - 5
Date Name
09/08/2026 Alley must be restored to existing or better condition. Alley surface must be graded and compacted to City Standards and Specifications for Public Improvements and existing drainage patterns must be restored and maintained. Any disturbed gravel must be replaced.
09/08/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
09/08/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
09/08/2026 Traffic control set-up approved between 9AM - 3:30PM
09/08/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.