Permit: TR-UTL-0926-01514
Permit Details
Status:
Issued
Type:
Right-of-Way (ROW) - Utility
Address:
4555 E 10TH ST
Address NEW:
4555 E 10TH ST
Apply Date:
09/03/2026
Applicant:
Angeline Trejo
Description:
ACCESSING (2) EXISTING MH & (3) EXISTING HH TO SPLICE FIBER. DIG (4) 4X4 BORE PITS. TOTAL ASPHALT REMOVED/REPLACED 18'. BORING 282' FROM EXISTING HH TO BOREPIT TO BOREPIT TO NEW HH. This project is for Lumen and will not be conveyed to any other company
Permit Reviews
Permit Number - TR-UTL-0926-01514
Permit Status: Issued
Permit Description: ACCESSING (2) EXISTING MH & (3) EXISTING HH TO SPLICE FIBER. DIG (4) 4X4 BORE PITS. TOTAL ASPHALT REMOVED/REPLACED 18'. BORING 282' FROM EXISTING HH TO BOREPIT TO BOREPIT TO NEW HH.
This project is for Lumen and will not be conveyed to any other company
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/15/2026 | RIGHT-OF-WAY REVIEW v.2 | 09/16/2026 | REQUIRES RESUBMIT |
| 09/24/2026 | RIGHT-OF-WAY REVIEW v.3 | 09/25/2026 | REQUIRES RESUBMIT |
| 09/03/2026 | RIGHT-OF-WAY REVIEW v.1 | 09/11/2026 | REQUIRES RESUBMIT |
| 10/15/2026 | RIGHT-OF-WAY REVIEW v.4 | 10/15/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TR-UTL-0926-01514
Permit Status: Issued
Permit Description: ACCESSING (2) EXISTING MH & (3) EXISTING HH TO SPLICE FIBER. DIG (4) 4X4 BORE PITS. TOTAL ASPHALT REMOVED/REPLACED 18'. BORING 282' FROM EXISTING HH TO BOREPIT TO BOREPIT TO NEW HH.
This project is for Lumen and will not be conveyed to any other company
Total Outstanding Activity Conditions - 8
| Date | Name |
|---|---|
| 09/09/2026 | Traffic Control set-up approved between 7AM - 5PM |
| 09/09/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 09/24/2026 | The following extended traffic control set-up times were approved: NIGHT WORK 9pm to 5 am for Intersection of 5th St and Swan Rd - |
| 09/24/2026 | Approved Temporary Noise Exemption required prior to Night work being performed within the City of Tucson Right of Way.. |
| 09/24/2026 | Condition FPUP Approved and uploaded Floodplain permit will be required prior to work. Within City of Tucson Right of Way. |
| 09/24/2026 | Coordination with Hunter Contracting Required for Active TC setups and Access times. Adam Bishop - Project Manager - C (520) 224-4989 adam.bishop@huntercontracting.com Russell Gonzalez - Project Manager - C (520) 540-5162 russell.gonzalez@huntercontracting.com All Traffic Control Setup will required approval from Hunter Contracting and may not impact Active City of Tucson CIP project work |
| 09/24/2026 | Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 - 42 Refer to COT 2015 Addition to the MUTCD section 14 |
| 09/24/2026 | Pre-Activity Meeting w/Inspections Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |