Permit Details

Status:
Needs Resubmittal
Type:
Right-of-Way (ROW) - Utility
Address NEW:
3900 N SUN TRAN BL
Apply Date:
09/02/2026
Applicant:
Ilana Galluzzo
Description:
CONTINUATION OF PERMIT TR-UTL-0426-00731 TO COMPLETE PAVEMENT RESTORATION - ESTIMATING 10 MORE WORKING DAYS IN THE ROW BUT REQUESTING 60 DAYS FOR PERMIT TO ALLOW TIME FOR CONTRACTOR CITY OF TUCSON SUN TRAN NW CNG STATION HIGH PRESSURE GAS MAIN EXTENSION - Boring and trenching along Runway Dr and Sun Tran Blvd. Approx. 1404' of trenching/boring in dirt and approx. 1100 of trenching/boring in pavement.

Permit Reviews

Permit Number - TR-UTL-0926-01507
Permit Status: Needs resubmittal
Permit Description: CONTINUATION OF PERMIT TR-UTL-0426-00731 TO COMPLETE PAVEMENT RESTORATION - ESTIMATING 10 MORE WORKING DAYS IN THE ROW BUT REQUESTING 60 DAYS FOR PERMIT TO ALLOW TIME FOR CONTRACTOR CITY OF TUCSON SUN TRAN NW CNG STATION HIGH PRESSURE GAS MAIN EXTENSION - Boring and trenching along Runway Dr and Sun Tran Blvd. Approx. 1404' of trenching/boring in dirt and approx. 1100 of trenching/boring in pavement.
Start Date Submittal Complete Date Status  
09/02/2026 RIGHT-OF-WAY REVIEW v.1 09/09/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0926-01507
Permit Status: Needs resubmittal
Permit Description: CONTINUATION OF PERMIT TR-UTL-0426-00731 TO COMPLETE PAVEMENT RESTORATION - ESTIMATING 10 MORE WORKING DAYS IN THE ROW BUT REQUESTING 60 DAYS FOR PERMIT TO ALLOW TIME FOR CONTRACTOR CITY OF TUCSON SUN TRAN NW CNG STATION HIGH PRESSURE GAS MAIN EXTENSION - Boring and trenching along Runway Dr and Sun Tran Blvd. Approx. 1404' of trenching/boring in dirt and approx. 1100 of trenching/boring in pavement.
Total Outstanding Activity Conditions - 4
Date Name
09/08/2026 Bus stop in the area, contact Joe Garcia, Sun Tran Dispatch, at 520-576-8726 at least 48-business hours prior to start of work for coordination
09/08/2026 **Pre-Activity Meeting w/Inspections **Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. ** PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. ** PAVEMENT PATCH TYPE SHALL BE IN CONFORMANCE TO THE CURRENT EDITION OF THE CITY OF TUCSON PUBLIC UTILITY ADMINISTRTIVE MANUAL **Pedestrian Access & Sidewalk PEDESTRIAN ACCESS MUST BE PROVIDED AND MAINTIANED PER MUTCD CHAPTER 6D. FIELD ADJUSTMENTS MAY BE REQUIRED. REPLACE/REPAIR SIDEWALK PANELS PER PAG STANDARD DETAIL 200\206 . PEDESTRIAN DETOUR ROUTE ON SAME SIDE OF RIGHT OF WAY TO BE PROVIDED. PER CITY CODE AND POLICY. Refer to MUTCD Chapter 6 Figure 6P-28, and 6K figure 6K-2. Refer to COT Utility manual Page 41 – 42 Refer to COT 2015 Addition to the MUTCD section 14
09/08/2026 Traffic control set-up approved between 9AM - 3:30PM
09/08/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.