Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Right-of-Way (ROW) - Utility
Address:
3939 N ORACLE RD
Address NEW:
3939 N ORACLE RD
Apply Date:
09/01/2026
Applicant:
Angeline Trejo
Description:
Splice at existing MH location on corner of W Hadley St and N Fairview Ave Splice at existing MH location on corner W Limberlost Dr and N 14th Ave Splice at existing MH location on corner of 14th Ave and W El Caminito Pl This project is for Lumen and will not be conveyed to any other company

Permit Reviews

Permit Number - TR-UTL-0926-01497
Permit Status: Inspections
Permit Description: Splice at existing MH location on corner of W Hadley St and N Fairview Ave Splice at existing MH location on corner W Limberlost Dr and N 14th Ave Splice at existing MH location on corner of 14th Ave and W El Caminito Pl This project is for Lumen and will not be conveyed to any other company
Start Date Submittal Complete Date Status  
09/02/2026 RIGHT-OF-WAY REVIEW v.1 09/23/2026 REQUIRES RESUBMIT Review Details
10/06/2026 RIGHT-OF-WAY REVIEW v.3 10/15/2026 APPROVED Review Details
09/25/2026 RIGHT-OF-WAY REVIEW v.2 10/01/2026 REQUIRES RESUBMIT Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0926-01497
Permit Status: Inspections
Permit Description: Splice at existing MH location on corner of W Hadley St and N Fairview Ave Splice at existing MH location on corner W Limberlost Dr and N 14th Ave Splice at existing MH location on corner of 14th Ave and W El Caminito Pl This project is for Lumen and will not be conveyed to any other company
Total Outstanding Activity Conditions - 8
Date Name
09/10/2026 City of Tucson Right of Way Only
09/10/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
09/10/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
09/10/2026 Traffic control set-up approved between 9AM - 3:30PM
09/10/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.
09/23/2026 The contractor shall not block driveways or restrict resident access without prior notification and shall coordinate directly with affected property owners as necessary.
10/15/2026 Lane and street closures shall be permitted only during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four-hour lane closures are not permitted unless specifically approved by the City. Traffic control devices shall not be stored in a bike lane or sidewalk.
10/15/2026 The contractor shall always maintain safe and continuous access to all adjacent businesses during construction.

Documents

File Name Document Type  
C.3112702_CAD_REV0_08262025_TUCSON_V1.PDF DOCUMENTS VIEW