Permit: TR-UTL-0926-01485
Permit Details
Status:
In Revision
Type:
Right-of-Way (ROW) - Utility
Address:
5525 S MISSION RD BLDG 1
Address NEW:
5525 S MISSION RD BLDG 1
Apply Date:
09/01/2026
Applicant:
Brittany West
Description:
Hang 2,825ft of new strand and new 144ct fiber. hang 2,415ft of new strand and 144ct fiber. bore along proposed path for 435ft at a depth of 36 inches. we will set 2 new vaults on each side of mission rd.
Permit Reviews
Permit Number - TR-UTL-0926-01485
Permit Status: In revision
Permit Description: Hang 2,825ft of new strand and new 144ct fiber. hang 2,415ft of new strand and 144ct fiber. bore along proposed path for 435ft at a depth of 36 inches. we will set 2 new vaults on each side of mission rd.
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/22/2026 | RIGHT-OF-WAY REVIEW v.2 | 10/26/2026 | APPROVED |
| 10/28/2026 | RIGHT-OF-WAY REVIEW REVISION v.1 | N/A | IN REVIEW |
| 09/01/2026 | RIGHT-OF-WAY REVIEW v.1 | 10/01/2026 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TR-UTL-0926-01485
Permit Status: In revision
Permit Description: Hang 2,825ft of new strand and new 144ct fiber. hang 2,415ft of new strand and 144ct fiber. bore along proposed path for 435ft at a depth of 36 inches. we will set 2 new vaults on each side of mission rd.
Total Outstanding Activity Conditions - 7
| Date | Name |
|---|---|
| 09/04/2026 | This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office at PDSDHistoric@tucsonaz.gov. |
| 09/04/2026 | Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING. |
| 09/04/2026 | Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online. |
| 09/04/2026 | Traffic control set-up approved between 9AM - 3:30PM |
| 09/04/2026 | Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area. |
| 10/26/2026 | Continuous ADA-compliant pedestrian access shall be maintained at all times. If a sidewalk is closed, an approved temporary pedestrian access route shall be provided in accordance with the Manual on Uniform Traffic Control Devices. |
| 10/26/2026 | Lane and street closures shall be permitted only during active work operations. At the end of each workday, the contractor shall remove all traffic control devices and reopen the roadway, bike lanes, and sidewalks to normal operation. Twenty-four-hour lane closures are not permitted unless specifically approved by the City. Traffic control devices shall not be stored in a bike lane or sidewalk. |