Permit Details

Status:
In Review
Type:
Right-of-Way (ROW) - Utility
Apply Date:
09/01/2026
Applicant:
Brittany West
Description:
Hang 2,825ft of new strand and new 144ct fiber. hang 2,415ft of new strand and 144ct fiber. bore along proposed path for 435ft at a depth of 36 inches. we will set 2 new vaults on each side of mission rd.

Permit Reviews

Permit Number - TR-UTL-0926-01485
Permit Status: In review
Permit Description: Hang 2,825ft of new strand and new 144ct fiber. hang 2,415ft of new strand and 144ct fiber. bore along proposed path for 435ft at a depth of 36 inches. we will set 2 new vaults on each side of mission rd.
Start Date Submittal Complete Date Status  
09/01/2026 RIGHT-OF-WAY REVIEW v.1 N/A IN REVIEW Review Details

Outstanding Activity Conditions

Permit Number - TR-UTL-0926-01485
Permit Status: In review
Permit Description: Hang 2,825ft of new strand and new 144ct fiber. hang 2,415ft of new strand and 144ct fiber. bore along proposed path for 435ft at a depth of 36 inches. we will set 2 new vaults on each side of mission rd.
Total Outstanding Activity Conditions - 5
Date Name
09/04/2026 This project is located in an Archaeological Sensitivity Zone. An Archaeological Monitor hired by the permit applicant is required to be on-site during any digging, unless a waiver is issued. Monitoring reports are to be submitted to Historic Preservation Office at PDSDHistoric@tucsonaz.gov.
09/04/2026 Notify in writing at least 5 working days before work begins, any businesses, residences and public transit routes affected by your temporary traffic control. PROOF OF NOTIFICATION IS REQUIRED AT THE TIME OF THE PRECONSTRUCTION MEETING.
09/04/2026 Pre- activity/construction meeting with City inspectors to be held 72 hours in advance of work start. Please request Inspections in your permit portal on TDC Online.
09/04/2026 Traffic control set-up approved between 9AM - 3:30PM
09/04/2026 Other Permits/Projects are or will be active in your project area. Please coordinate with the project manager in charge of any existing traffic control set-ups in your project area.